Laserfiche WebLink
September 7, 2016 C-1980-007/West Elk Mine LDS <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 4 of 17 <br /> <br />A single pad, with two active MVBs was inspected. E6-8 (completed at around cross-cut 46) and E6-9 <br />(completed at around cross-cut 43), were both being pumped and venting methane. The pumps were protected by a <br />chain link fence. <br />The E-5 pads will be left open while the mining of the E-6 panel is completed. The E4-15, -16 and -17 <br />holes had just been plugged (by RACS) and the associated pads were expected to be reclaimed shortly (by Beavers <br />Construction). <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Topsoil stockpiles were well vegetated and clearly marked. <br /> <br /> <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br /> <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br />