Laserfiche WebLink
Jason Musick -2- September 9, 2016 <br />The expansion area for Pond J is within the currently approved disturbed area boundary. Two <br />stockpiles will be created to store the excavated material. Both stockpiles are within the <br />disturbed area, one falls outside the currently approved boundary, but is within the disturbed <br />area. <br />Please feel free to contact me with questions. <br />Sincerely, <br />Ta�.vv� � 13ins% o p <br />Tamme Bishop, P.E. <br />Project Engineer <br />Enclosures: <br />Volume II: Maps 15-3, 18, 20, 21-3, 22-J, 32 <br />Volume XI: Text pages: 4b & 6 <br />Cc: Bill Bear, Bowie Resources, LLC (electronically) <br />Paonia Public Library <br />Bureau of Land Management (electronically) <br />US Forest Service (electronically) <br />