Laserfiche WebLink
Exhibit D— Mining Plan North Pit <br /> Currently, the active mining, crushing, and stock piles area of 22.43 acres is noted on the map in <br /> orange color. We have not disturbed any acreage that was not already in use since taking over <br /> the pit. <br /> The plan is to continue mining to the North East corner of the permitted area. Approx. 9.6 <br /> acres depicted as grey area on map. As we continue to move in a North East direction, any <br /> overburden and fines will be used for fill until we achieve elevations and grading for <br /> reclamation. Maximum height of the highwall will be less than 30' and 30' long. <br /> Mining will be done by using a licensed blaster and excavate material to solid rock and hauling <br /> the material to the crusher via loader if its close or haul truck if its further away. Dust will be <br /> controlled by a watering system. Water will be hauled up to mining site via water truck from <br /> the river below and place in a water tank. The water tank will be clearly marked non potable <br /> water and be used for dust control. There will be no water held on site. There will be a small <br /> retention area at the bottom of the hill if needed. <br /> Our plan is to keep the mined area around 20 to 25 acres. We will continue to maintain <br /> property boundaries and continue weed control. <br />