Laserfiche WebLink
Ms. Crawford <br /> Page 2 <br /> September 1, 2016 <br /> product stockpiles. Please revise the Mining Plan Map to include any of the above mentioned <br /> features which apply to the Sulphur Mtn. operation. <br /> 4. The Mining Plan Map did not include a map scale. The acceptable range of map scales shall <br /> not be larger than 1 inch = 50 feet nor smaller than 1 inch= 660 feet. Please revise the <br /> Mining Plan Map to include a map scale. <br /> 5. The Mining Plan Map must be signed by a registered land surveyor, professional engineer, or <br /> other qualified person. Please revise the Mining Plan Map accordingly. <br /> 6. The Mining Plan Map must show the direction that constriction material extraction will <br /> proceed. This information can be indicated in text or with arrows. <br /> This concludes the Division's preliminary adequacy review of this Technical Revision. Please <br /> remember that the decision date for this Technical Revision is September 23, 2016. As <br /> previously mentioned, if you are unable to provide satisfactory responses to any inadequacies <br /> prior to this date, it will be your responsibility to request an extension of time to allow for <br /> continued review of this Technical Revision. If there are still unresolved issues when the <br /> decision date arrives and no extension has been requested, the Technical Revision will be denied. <br /> If you have any questions, please contact me at (303)866-3567 x8116. <br /> Sincerely, <br /> Michael A. iuunningham <br /> Environmental Protection Specialist <br /> CC: Wally Erickson, DRMS <br />