Laserfiche WebLink
Pagel of 138 <br />COST SUMMARY WORK <br />Task description: CostSummary <br />Site: Peabody Sage Creek Mne Permit Action: RN1-2015 Permit/Job#: C2009087 <br />PROJECT IDENTIFICATION <br />Task#: 000 <br />Date: 8/31/2016 <br />3:13:46 PM <br />State: Colorado <br />County: Routt <br />User: JLE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C087-000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />010 <br />011 <br />012 <br />013 <br />020 <br />021 <br />022 <br />023 <br />024 <br />030 <br />031 <br />032 <br />033 <br />034 <br />035 <br />040 <br />041 <br />042 <br />045 <br />046 <br />047 <br />050 <br />051 <br />052 <br />053 <br />054 <br />060 <br />Haul Backfill Mat. from Coal Handling Fac. to <br />Portal <br />TRUCK1 <br />2 <br />3 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />243.07 <br />$382,729.00 <br />$219,030.00 <br />$345,239.00 <br />$112,812.00 <br />$9,704.00 <br />$1,447.00 <br />$1,665.00 <br />$416.00 <br />$7,436.00 <br />$17,159.00 <br />$4,575.00 <br />$858.00 <br />$737.00 <br />$1,107.00 <br />$2,555.00 <br />$681.00 <br />$128.00 <br />$112.00 <br />$1,277.00 <br />$3,023.00 <br />$2,044.00 <br />$894.00 <br />$22,484.00 <br />$15,200.00 <br />$6,776.00 <br />$3,452.00 <br />$2,466.00 <br />$155.00 <br />$24.00 <br />$11.00 <br />$35,444.00 <br />Haul Backfill Material from Utility Pad Area to <br />PortalFace- <br />TRUCKI <br />102.12 <br />Haul Backfill Material from South Facilities to <br />PortalFace- <br />TRUCK1 <br />182.31 <br />Remove Coal Stockpile Footprint <br />TRUCKI <br />63.46 <br />Regrade Cut Material Over 6.93 ROM Coal Area <br />DOZER <br />46.54 <br />Regrade Cut Material Over covered Storage Pad <br />Area <br />DOZER <br />6.94 <br />Regrade Drill Pads COVl1, CCU31, CCU47, <br />CCU58, CCU67, CCU84, <br />DOZER <br />7.78 <br />Regrade Drill Pads CCU087 and Septic Drainfield <br />DOZER <br />1.94 <br />Remove Gravel fromNorth Facilities Parking Area <br />TRUCKI <br />4.99 <br />Remove Gravel from Main North Facilities Area <br />TRUCKI <br />11.51 <br />Remove Gravel fromNorth Facilities Electrical <br />Shop Area <br />TRUCK1 <br />3.07 <br />Remove Gravel fromNorth Office Parking Area <br />TRUCK1 <br />0.58 <br />Remove Gravel from South Powder Magazine Pad <br />TRUCK1 <br />0.49 <br />Rip North Facilities Parking Area <br />RIPPER <br />3.24 <br />Rip North Facilities Area <br />RIPPER <br />7.48 <br />Rip North Electrical Shop Facilities Area <br />RIPPER <br />1.99 <br />Rip North Office Parking Area <br />RIPPER <br />0.37 <br />Rip South PowderMa azine Pad <br />RIPPER <br />0.32 <br />Rip South Covered Stor eArea <br />RIPPER <br />3.74 <br />Rip Haulroad A/Al Reduction <br />RIPPER <br />8.85 <br />Rip Haulroad B Reduction <br />RIPPER <br />5.98 <br />Rip Haulroad D <br />RIPPER <br />2.61 <br />Regrade HaulroadA/Al Reduction <br />DOZER <br />32.94 <br />Regrade HaulroadB Reduction <br />DOZER <br />22.27 <br />Regrade HaulroadD <br />DOZER <br />9.93 <br />Regrade Upper Surrip <br />DOZER <br />10.36 <br />Regrade Lower Sunip <br />DOZER <br />7.40 <br />Regrade Area Ditches <br />GRADER <br />1.03 <br />Backfill and Regrade Microwave Tower Pad <br />(MR22) <br />DOZER <br />0.16 <br />Replace Topsoil on Microwave Tower Pad <br />DOZER <br />0.08 <br />Replace Top soil on Coal Handling Facilities Area <br />SCRAPERI <br />30.32 <br />CIRCES Cost Estimating So$ware <br />