Laserfiche WebLink
including removal of supports, wire&conduit terminations", (2016 RSMeans #26 05 <br /> 05.10.1550) is $688.00 each for a total of $1,376.00. The RS Means estimate for "Cold <br /> milling asphalt paving, asphalt pavement, 3"-6" deep, removal from concrete base, rip, <br /> load and sweep", (2016 RSMeans #32 01 16.71.5330) is $0.86 per square yard for a total of <br /> $24.08. A 22% contingency was added to the RS Means demolition cost $308.02. The RS <br /> Means "B-20" crew was used at 4 hours labor (based off of Davis-Bacon wage rates) <br /> resulting in a total of $747.52 to complete removal of concrete slab. The project in whole <br /> will increase the reclamation costs by a total of$1,708.10. <br /> Comment 2: Specifications <br /> The Division compared the specifications submitted as DRAFT on April 7, 2016 with the second <br /> Draft provided to the Division during the meeting with CC&Vpersonnel on June 8, 2016 and the <br /> final corrected specifications received on July 11, 2016. The following discrepancies were noted: <br /> a. Specification 01050 for Construction Staking was included in the first two draft versions of <br /> the specifications, but not included in the corrected July submittal. <br /> Response 2a: Please see the updated and corrected specifications enclosed. <br /> NewFields has supplied a stamped version of Specification 01050. <br /> b. Specification 01400.1 appears to have had problems in formatting the redline/strikeout <br /> revisions on page 9 and II that have the potential to change the interpretation of these <br /> specifications. <br /> i. What should be the fourth bullet on the top of p. 9 under the previous p. 8 Section <br /> 7.5, actually ended zip as part of the Section 7.6 heading. "Signature of the CQA <br /> Monitor"should be the final bulleted item to be included in the Weekly Progress <br /> Reports. <br /> Response 2b(i): Please see the updated and corrected specifications enclosed. <br /> NewFields corrected the formatting by including the Signature of the CQA Monitor <br /> as the forth bullet in section 7.5, and corrected the title of Section 7.6 to <br /> Construction Certification Report. <br /> ii. The last paragraph on p. 9 should in fact be the final bulleted item under Section <br /> 7.6, rather than a separate paragraph. <br /> Response 2b(ii): Please see the updated and corrected specifications enclosed. <br /> NewFields changed the last paragraph into the final bullet of Section 7.6. <br /> c. Specification 01400.2 appears to have had problems in formatting the redline/strikeout <br /> revisions on page I that have the potential to change the interpretation of these <br />