Laserfiche WebLink
AAAVS GNV ONINIW <br /> 1--IVEWMONT NOUVW' 03213ONOISIA1a <br /> Newmont Mining Corporation <br /> / �^" 6363 South Fiddler's Green Circle Suite 900 <br /> 910z v nv Greenwood Village CO 80111 <br /> T 719-659-29177 <br /> F 719-689-3254 <br /> w1vivvnev,monicorn <br /> SENT CERTIFIED, RETURN RECEIPT REQUESTED <br /> 7015-1660-0000-0779-7259 <br /> August 29, 2016 <br /> Mr. Timothy Cazier, P.E. <br /> Environmental Protection Specialist <br /> Colorado Department of Natural Resources <br /> Division of Reclamation, Mining and Safety <br /> Office of Mined Land Reclamation <br /> 1313 Sherman Street, Room 215 <br /> Denver, Colorado 80203 <br /> t/ <br /> Re: Permit No. M-1980-244. Cripple Creek & Victor Gold Mining Company "CC&V" <br /> Cresson Pro'ect• — es onse.tb DRMS Technical Revisio - -Preliminga Adequacy <br /> Review for Squaw u ch Valley Leach Facility SGVLF) Specification Changes and High <br /> Grade Mill (HGM) Grizzly/Conveyor Power Upgrade <br /> Dear Mr. Cazier: <br /> As a follow up to Division of Reclamation, Mining and Safety's (DRMS)August 5th letter for <br /> preliminary adequacy review comments of technical revision TR-78. Please see DRMS <br /> comments in italics below with Newmont's response to comments in bold. <br /> Comment 1: <br /> Warranty Estimate. Based on Drawing 2, there are two transformers and two electrical/phase panels <br /> that are not addressed in the warranty estimate. Please include demolition and disposal of these <br /> items in the warranty estimate. <br /> Response 1: <br /> Black Hills Energy owns the two transformers shown in Drawing 2 therefore now <br /> reclamation removal costs were calculated. <br /> CC&V used the 2016 RS Means costs for calculating the increase in reclamation cost for <br /> removal of the two electrical phase panels and the concrete pad. The RS Means estimate <br /> for "Transformer, dry type, primary, 3 phase, to 600 V, 300 kVA, electrical demolition, <br />