rangeland seed mix per the reclamation plan developed for the site. Hydromulching techniques <br /> were employed due to the steep slopes involved at the construction site. Also, several topsoil piles <br /> established in 1995 adjacent to the coal refuse pile as shown, SF-8, SF-12, SF-13, and SF-14, were <br /> seeded May 1996 with the approved seed mixture. <br /> The two barricade chamber drill pads developed over the 9-Right and 10-Right gateroad entries in <br /> 1995 were reseeded in November 1996 due to poor vegetation establishment at the sites. At the <br /> 10-Right borehole, the standpipe was removed and the borehole was sealed. Reclamation at this <br /> site is complete. The 9-Right stand pipe and borehole will remain until the facility is no longer <br /> needed. At that time, the hole will be permanently sealed per the approved plan and the site finally <br /> graded and seeded. As previously noted, the disturbance associated with these sites comprises less <br /> than 0.5 acres. The sites were seeded with the approved pastureland seed mix following the initial <br /> regrading work completed in 1995 and were reseeded with the same mix in November 1996. <br /> A drill pad and monitor well installation for the replacement of well FCM#2 (95M001) was <br /> completed during 1995. Disturbance at this site comprised less than 0.2 acres. The site was <br /> regraded and retopsoiled during the fall of 1996 and seeded in November 1996 with the approved <br /> pastureland seed mixture. <br /> Partial regrading and retopsoiling of the eastern mining district ventilation shaft site was <br /> accomplished in 1996. The western half of the site which formerly contained the mud pits utilized <br /> in drilling the shafts, was regraded,topsoiled, and seeded with the approved pastureland seed mix <br /> in November 1996. The remaining reclamation work at the site will not commence until the <br /> constructed facilities are no longer needed in support of the mining operation. <br /> Approximately 7 acres of additional disturbance associated with a newly constructed outlying <br /> facility is reported for 1996. The mine water return line originating at the eastern mining district <br /> dewatering well site and traversing to the borehole located at the sandstone substation was <br /> reclaimed and seeded in November 1996 following the waterline installation. This site utilized <br /> the approved pastureland seed mix. <br /> One final outlying parcel was reclaimed during 1996. The drill pad and facility site for the <br /> southwest ventilation borehole located generally west of the TCC facilities in Section 36 was <br /> regraded, retopsoiled and seeded in November 1996. Weather conditions precluded seeding on <br /> the road leading into the site although regrading and topsoiling activities were competed. Seeding <br /> operations will be completed at the first available opportunity in 1997, prior to the initiation of the <br /> growing season. <br /> Several areas were disturbed prior to 1996 and remain Twentymile Coal Company's responsibility. <br /> These locations are included in Table 1 and shown on the 1996 Annual Reclamation Report maps. <br /> These locations include the Sandstone Substation, Fish Creek Tipple, Fish Creek Borehole, TCC <br /> Surface Facilities, Coal Refuse Pile, Southwest Borehole, Drill Pad 95M001, EMD Vent Shaft, <br /> Escape Shaft, Rock Dust Tank, 9 Rt and 10 Rt Barricade Chambers, and the Rockfall Mitigation <br /> Trench and Berm Structures. <br />