replacement well FCM#2 was also completed during 1995. Disturbance at this site comprises <br />less than 0.2 acres. No reclamation work was completed during 1995 at this site due to adverse <br />weather conditions prevalent at the completion of drilling activities. <br />Disturbance associated with development of the 7 North escape shaft totals approximately 2.5 <br />acres. Approximately 1.9 acres of disturbance is associated with the pad itself with the <br />remaining acreage covering the newly constructed road to the site. The area has been stabilized <br />with outslopes and the topsoil stockpile seeded with the approved pastureland seed mix. <br />Two additional outlying facility projects were undertaken in 1995. The projects were initiated <br />under an approved NOI. The eastern mining district ventilation shaft site was constructed and <br />covers approximately 2.8 acres. Topsoil piles and disturbed outslopes were seeded with the <br />approved pastureland seed mix. The new eastern mining district dewatering borehole site was <br />also developed under the NOI and comprises approximately 3.5 acres of disturbance with 1.9 <br />acres located at the pad site and the remaining 1.6 acres associated with road constructed to the <br />site. Topsoil piles and disturbed slopes associated with this work were also seeded with the <br />approved pastureland seed mix. <br />Lastly, an additional 27.3 acres of disturbance associated with construction of the trench/berm <br />rockfall mitigation project was constructed in 1995. The disturbed areas were hydroseeded and <br />hydromulched due to the steep slopes involved at the construction site and due to safety concerns <br />which precluded access to the structure interiors. The hydroseeding project was suspended <br />before completion due to adverse weather conditions and approximately 5 acres of the <br />easternmost trench/berm structure has yet to be seeded. Seeding operations will be completed at <br />the first available opportunity in 1996. The trench/berm structures were seeded with the <br />approved rangeland seed mix per the reclamation plan developed for the site. The outslopes <br />along the south side of relocated County Road 27 were also seeded and cimprise approximately 3 <br />additional acres of disturbance. <br />Several areas were disturbed prior to 1995 and remain Twentymile Coal Company's <br />responsibility. These locations are included in Table 1 and shown on the 1995 Annual <br />Reclamation Report maps. These locations include the Sandstone Substation, Fish Creek Tipple, <br />Fish Creek Borehole, surface facilities, Southwest Borehole, and the rock dust tank disturbance <br />areas. <br />