Geotechnical Evaluations  <br />Reclamation of Little Deadwood Gulch and Chief Portal  <br />May Day Idaho Mine Complex, La Plata County, Colorado  <br />112d‐1 Reclamation Permit No. M‐1981‐185  <br />August 13, 2016  <br />Page 3  <br />  <br />13th geotechnical report. However, the March 13th report assumed that a greater fraction of fine grained soil was  <br />available, that processing of the fill would be limited to removing minor amounts of oversize particles, that  <br />conventional density tests could be performed to check compaction of the fill, and finally that subdrains needed  <br />to be installed to prevent the building of hydrostatic pressures behind the relatively low permeability fill.  Given  <br />the differing site conditions, Wildcat implemented an alternative approach that took advantage of materials  <br />with a high fraction of oversize particles.  These oversize particles are angular and consist of strong brecciated  <br />sandstone.  When placed together, they will tend to exhibit a high angle of internal fraction (Ø), exhibit very  <br />little strength loss with increased moisture content, and, because it is highly permeable, essentially precludes  <br />the building of hydrostatic pressure within the fill.  <br />Recommendations <br />Further work should be performed at the top of the slope where it intersects the Incas access road.  The near  <br />vertical section at the top of slope should be flatted to match the rest of the slope. We observed several large  <br />flat boulders that were exhumed during the removal of old fill from the adjacent Little Deadwood Gulch.  On a  <br />properly prepared foundation, these boulders could be placed along the outboard edge of the access road and  <br />adequately serve as the recommended retaining structure.  <br />We further recommend that the planned grading work in Little Deadwood Gulch be performed in a manner that  <br />ensures that positive drainage away from the portal is maintained. As described above, the fill material used to  <br />construct the embankment is free draining and as such should be provided with positive drainage to ensure that  <br />water flows away from the portal and thus does not pond, dam or otherwise buildup within the fill.    <br />If you have any questions, please call.  <br />Sincerely yours,  <br />  <br />J. Erich Rauber, P.E.  <br />Geotechnical Engineer  <br />JER/er  <br />Attachments  <br />cc:  George M.L. Robinson – Wildcat Mining Corporation  <br />