Laserfiche WebLink
August 24, 2016 C-1981-038/Bowie No. 1 Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 5 <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and Maintenance <br />4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> <br />The East Mine Haul Road has been narrowed to the current configuration. All surface drainage is directed to the <br />roadside ditch on the uphill side of the road by water bars. The ditch flow is then directed out of the ditches and <br />into Ditch 7, a drainage that runs parallel to the west side of the West Ridge Waste Pile, and out of the affected <br />area west of the West Ridge Waste Pile. The East Mine Haul Road was stable with no problems noted. <br /> <br />All roads associated with the Loadout area and the East Mine were stable and accessible during the inspection with <br />no problems noted. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br /> <br />The Paonia Loadout continues to be utilized by Bowie Resources as a storage facility for mine related material <br />from the Bowie No. 2 Mine. The Loadout was stable with no problems noted. As noted in the Hydrologic <br />Balance section of this report, the north side clear water ditch has recently been cleared and is stable. <br /> <br />A portion of the railway gravel ballast was removed during the summer and the gravel remains stockpiled on site. <br /> <br /> <br /> <br />DOCUMENTS RECEIVED - NA <br />OTHER (SPECIFY) - NA <br /> <br />