Laserfiche WebLink
V\ p4'CD�p <br /> COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567 <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET AUG <br /> �Sl <br /> File No.: M- 77-559 Site Name: Canon City East Pit (MacKenzie PONN 6 UC , , + <br /> �• i9� ss9 <br /> County Fremont TR# (DRMS Use only) <br /> Permittee: Valco. Inc. T R04 <br /> Operator(If Other than Permittee): <br /> Complied. <br /> Permittee Representative:Tom Brubaker, President 0 Violations <br /> Please provide a brief description of the proposed revision: <br /> Minor reduction in reseeded areas to be compatible with final recreational usage, in addition to <br /> wildlite habitat end use. Leaving some structures or changed end use, and mo i ica ion ot tree <br /> planting and removal. Also to change the name of the mine from Canon City East to MacKenzie Pit <br /> As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing, to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit Type Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 <br /> 112 hard rock (not DMO) $175 ❑ <br /> 110d, 112d(1, 2 or 3) $1006 ❑ <br />