My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-17_PERMIT FILE - M2016033
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016033
>
2016-08-17_PERMIT FILE - M2016033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2020 3:45:16 AM
Creation date
8/18/2016 10:35:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016033
IBM Index Class Name
Permit File
Doc Date
8/17/2016
Doc Name
Adequacy Review Response
From
Holsinger Law, LLC
To
DRMS
Email Name
PSH
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 of 20 <br /> 39. What erosion control measures will be constructed? <br /> (N.Reed) <br /> 40. Exhibit D states "blasting will be scheduled in such way that impact will be minimized to <br /> nearby areas"- what does "nearby"include?Include LTC road?Just properties adjacent to <br /> quarry?All property owners on LTC road?All property owners within Eagles Nest?Include <br /> all segments of LTC road that pass thru Sect 16? <br /> (N. Reed) <br /> 41. Will any in pit access and/or haul roads intersect LTC road? <br /> (N. Reed) <br /> 42. Blasting-how does plan demonstrate vibrations will be within required limits for properties <br /> located outside quarry area? What plans to compensate for damage to property from <br /> blasting? Or for damage to LTC road due to rockslides or flying rocks? <br /> (N.Reed) <br /> 43. Blasting plan - what is impact radius? Will extend beyond quarry boundary?Ever extend to <br /> Eagles Nest or LTC road? <br /> (N.Reed) <br /> 44. Blasting plan - what type & quantity of chemical residue will collect in LTC watershed from <br /> blasting chemicals? <br /> (N.Reed) <br /> 45. Blasting plan -how far in advance will blasting schedule be known? <br /> (N. Reed) <br /> 46. Blasting plan -if quarry needs to blast more than proposed 3x/week, is there process to <br /> request? Who approves additional blasting? <br /> (N.Reed) <br /> 47. Blasting plan - where will blast notification signs be placed? Will signs be updated if blast <br /> time modified? When will signs be posted?Is scheduled time exact?Ever delayed?How far <br /> in advance road blocked? <br /> (N.Reed) <br /> 48. Blasting plan - will there be different combos of blasting audible signals-or will remain <br /> same?How far away will signals be heard? <br /> (N. Reed) <br /> 49. Blasting plan - who will be notified of blasting planned outside normal blasting operations? <br /> All Eagles Nest landowners? Could affected landowners request notification of every <br /> planned blast? <br /> (N.Reed) <br /> o CO <br /> 1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832,8106 http://mining.state.co.us Few <br /> John W. Hickenlooper, Governor I Robert W. Randall, Executive Director ( Virginia Brannon, Director H ! <br /> \�!876 <br />
The URL can be used to link to this page
Your browser does not support the video tag.