My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-13_PERMIT FILE - P2016020 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2016020
>
2016-08-13_PERMIT FILE - P2016020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 10:42:35 PM
Creation date
8/16/2016 9:46:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016020
IBM Index Class Name
Permit File
Doc Date
8/13/2016
Doc Name
Compliance Order on Consent and Settlement Agreement
From
Minewater
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. The Water Tunnel Permit authorizes London Mine, LLC to discharge treated wastewater from the <br /> Water Tunnel Facility through the outfalt associated with the sedimentation pond (Outfall 001A) <br /> and into South Mosquito Creek. <br /> 6. Acid mine drainage from the London Mine has also historically emanated from the London Mine via <br /> the Extension Tunnel. Wastewater from the Extension Tunnel is conveyed to a mechanical <br /> wastewater treatment plant (the "Extension Tunnel Facility"). The Extension Tunnel Facility's <br /> wastewater treatment process is comprised of four main unit processes: a system inside the <br /> Extension Tunnel adit that collects raw water from the Extension Tunnel; chemical precipitation; <br /> sedimentation; and effluent pH control. The Extension Tunnel adit includes a partial bulkhead <br /> constructed to impound Extension Tunnel flows and has a relief valve at the bottom and a <br /> collection pipe two feet above the floor of the mine. The relief valve regulates influent flow to <br /> the downstream processes and flushes sediments that accumulate behind the partial bulkhead into <br /> the settling pond outside of the adit. Water flows out of the Extension Tunnel into a piping system <br /> where time is added to the water flowing in the pipe thereby raising the pH. The time/water <br /> mixture then flows into several settling tanks where residual time and precipitated metals settle <br /> out. Overflow from the settling tanks flows through an acid feed pump that lowers effluent pH <br /> prior to discharging to No Name Creek through a 2-inch Parshall flume. The Extension Tunnel <br /> Facility is the subject of the Colorado Discharge Permit System, Permit No. CO-0045209 (the <br /> "Extension Tunnel Permit"). The Extension Tunnel Permit became effective on February 1, 2006 <br /> and expired on January 31, 2011 and has subsequently been administratively extended, pending <br /> permit reissuance. The Extension Tunnel Discharge Permit is held by PCMD #9, as assignee from <br /> THF, pursuant to the terms and conditions of the 2004 Stipulation. <br /> 7. The Extension Tunnel Permit authorizes PCMD #9 to discharge treated wastewater from the <br /> Extension Tunnel Facility through Outfall 001A and into No Name Creek, a tributary to South <br /> Mosquito Creek. <br /> 8. By the terms of a Purchase and Sate Agreement executed or to be executed in July or August 2016 <br /> by and among London Mine, LLC, MineWater and others, London Mine, LLC and the Estate will <br /> convey all rights and interests in the London Mine itself to MineWater. The Estate will also convey <br /> all conditional water rights associated with or otherwise arising from the London Mine to THF. <br /> Upon closing, THF will then own all the conditional water rights currently held by the Estate and <br /> MineWater will own the London Mine and the mineral interests associated with the same, subject <br /> to the terms of additional agreements between THF and MineWater. <br /> 9. The Purchase and Sale Agreement referenced above in paragraph 8, and other agreements <br /> between MineWater and THF and/or PCMD #9, contemplate transfer of the Extension Tunnel <br /> Discharge Permit to MineWater at closing. <br /> 10. MineWater is a party to the Purchase and Sale Agreement, as well as other associated agreements, <br /> that authorizes, but does not require, MineWater to accept transfer of both the Water Tunnel <br /> Permit and the Extension Tunnel Permit. Upon closing of said Purchase and Sale Agreement, the <br /> Division will simultaneously approve transfer of said permits to MineWater, subject to the terms of <br /> this Consent Order and Settlement Agreement. <br /> 11. This Consent Order and Settlement Agreement is intended to resolve all prior water discharge <br /> violations, whether alleged or unalleged, associated with the London Mine and create a <br /> framework for treatment and compliance of future water discharges from the London Mine upon <br /> closing of the Purchase and Sale Agreement transaction among the applicable Parties. <br /> London Mine, LLC, et at. C O L O R A D O <br /> Compliance Order on Consent and Settlement Agreement JETDepartment or Public <br /> Page 3 of 23 Health 6 EnvUo=ent <br />
The URL can be used to link to this page
Your browser does not support the video tag.