My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-13_PERMIT FILE - P2016020 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2016020
>
2016-08-13_PERMIT FILE - P2016020 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 10:42:35 PM
Creation date
8/16/2016 9:46:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016020
IBM Index Class Name
Permit File
Doc Date
8/13/2016
Doc Name
Compliance Order on Consent and Settlement Agreement
From
Minewater
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF PURPOSE <br /> 12. The mutual objectives of the Parties in entering into this Consent Order and Settlement <br /> Agreement are: <br /> a. To establish compliance requirements and criteria for the continued operation of the <br /> Water Tunnel Facility; and <br /> b. To resolve, without further administrative action or litigation, the orders, directives, <br /> claims and penalties associated with (1) the alleged violations cited herein; (2) the <br /> alleged violations cited in the Notice of Violation /Cease and Desist Order (Number: 10- <br /> 090715-1that the Division issued to London Mine, LLC on July 15, 2009); (3) the <br /> violations cited in Notice of Violation /Cease and Desist Order, Number: 10-130321-1 <br /> that the Division reissued to London Mine, LLC on March 21, 2013, as upheld on appeal <br /> by the Office of Administrative Courts through an Initial Decision issued on January 6, <br /> 2016; (4) the alleged violations cited in the Notice of Violation/Cease and Desist Order/ <br /> Order for Civil Penalty (Number: 10-150730-1 ) issued to London Mine, LLC, the Estate, <br /> and Meyer on July 30, 2015, and (5) any potential orders, directives, claims and <br /> penalties against any Party arising from or relating to discharges from the London Mine <br /> arising or occurring prior to and as of the effective date of this Consent Order and <br /> Settlement Agreement; and <br /> c. To facilitate the sale of the London Mine Property to MineWater so that MineWater can <br /> implement measures to address contaminated water at the London Mine that is <br /> currently not being treated adequately; and <br /> d. To recognize that MineWater will implement the most feasible method of water <br /> treatment at the London Mine and to develop a supportive regulatory framework for <br /> addressing the water quality conditions at the London Mine property, including revising <br /> certain Colorado Discharge Permit System conditions and/ or stream standards, if <br /> appropriate; and <br /> e. To recognize that MineWater may in the future seek permits to undertake bona fide <br /> mining activity including reopening the London Mine for mining activity; and <br /> f. To establish a framework for the adoption of a feasibility-based ambient standard <br /> and/or a discharger specific variance for certain parameters, specifically including <br /> metals, in No Name Creek, South Mosquito Creek and Mosquito Creek for the discharge <br /> associated with the London Mine Water Tunnel Facility; and <br /> g. To establish an enforceable compliance schedule for MineWater to achieve compliance <br /> with the Water Tunnel Permit from the date of this Consent Order and Settlement <br /> Agreement going forward, as said Water Tunnel Permit may be revised to the extent <br /> feasibility-based ambient standards are adopted for the relevant stream segments <br /> and/or a discharger specific variance is approved for the Water Tunnel Facility, but in <br /> no event will compliance requirements for zinc and/or cadmium be made more <br /> stringent than the current Water Tunnel Permit; and <br /> h. To establish stipulated penalties for Water Tunnel Permit effluent violations that may <br /> occur subsequent to MineWater's signature to this Consent Order and Settlement <br /> Agreement and prior to completion of the compliance schedule specified herein <br /> (September 30, 2018); and <br /> London Mine, LLC, et at. C O L O R A D O <br /> Compliance Order on Consent and Settlement Agreement e® De�entofPublic <br /> Page 4 of 23 He lth 6 Environment <br />
The URL can be used to link to this page
Your browser does not support the video tag.