Laserfiche WebLink
Bulldozer Worksheet Cont’d Task # 161 Page 1 of 2 <br /> <br /> <br />BULLDOZER WORK <br /> <br />Task description: Spread Topsoil (assume 1 acre) <br />Site: Marrs Memorials Permit Action: 2016 Update Permit/Job#: M1977168 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 161 State: Colorado Abbreviation: None <br />Date: 8/12/2016 County: Fremont Filename: M168-161 <br />User: TC1 <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D6T LGP <br />Horsepower: 200 <br />Blade Type: Straight <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $49.71 NA <br />Operating Cost/Hour: $51.50 100 <br />Ripper own. Cost/Hour: $0.00 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $140.10 <br />Total Fleet Cost/Hour: $140.10 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 807 <br />Swell factor: 1.000 <br />Loose volume: 807 LCY <br />Source of estimated volume: 1 Acre @ 6” deep <br />Source of estimated swell factor: Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Unadjusted hourly production: 212.5 LCY/hr <br /> <br />Materials consistency description: Loose stockpile 1.2 <br /> <br />Average push gradient: 0 % <br />Average site altitude: 6,800 feet <br /> <br />Material weight: 2,100 lbs/LCY <br /> <br />Weight description: Earth - Loam <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG.) <br />Material consistency: 1.200 (CAT HB) <br />Dozing method: 1.100 (50% SL) <br />Visibility: 1.000 (AVG.)