Laserfiche WebLink
<br /> <br />COST SUMMARY WORK <br /> <br />Task description: Reclamation Cost Summary <br />Site: Marrs Memorials Permit Action: 2016 Update Permit/Job#: M1977168 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 160 State: Colorado Abbreviation: None <br />Date: 8/12/2016 County: Fremont Filename: M168-160 <br />User: TC1 <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />161 Spread Topsoil (assume 1 acre) DOZER 1 3.91 $548.00 <br />162 Reveg REVEGE 1 3.00 $538.00 <br />163 Mob/Demob Equip. MOBILIZE 1 3.66 $1,091.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />10.57 <br /> <br />$2,177 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $43.98 <br />Performance bond: 1.05 Total = $22.86 <br />Job superintendent: 5.84 Total = $434.96 <br />Profit: 10.00 Total = $217.70 <br /> TOTAL O & P = $719.50 <br /> CONTRACT AMOUNT (direct + O & P) = $2,896.50 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 Total = $0.00 <br />Reclamation management and/or administration: 5.00 $144.83 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $864.33 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $3,041.33 <br />