Laserfiche WebLink
Table D-3 <br /> MINING TONNAGE PER AREA <br /> Phase Acres Acres Tons Gravel Gravel Life Exposed <br /> (Total) (Mined) (years) Area <br /> Acres/Year <br /> 1 20.95 19.50 512,798 1.9 9.8 <br /> 2 115.44 111.32 2,341,935 8.7 12.8 <br /> 3. Minns Timetable <br /> Mining operations would begin in 2008,provided that all permits are granted. Mining <br /> would last approximately I I years, although the market plays a large role in the length of <br /> the mining. Western Gravel LLC expects the average production from the pit is 250,000 <br /> tons per year. <br /> 4.Facilities and Equipment <br /> The site may contain: <br /> - A portable screening/washing plant with a 500 gallon diesel tank <br /> - A portable Asphalt plant with a 25.00 gallon diesel tank <br /> - A portable Concrete plant with a 500 gallon diesel tank <br /> - Portable Scales <br /> - A portable office trailer <br /> - A portable crusher with a 2,000 gallon diesel tank <br /> - A fuel farm with a 10,000 gallon diesel tank <br /> A portable QC lab trailer <br /> - A small portable shop trailer <br /> Mobile equipment which will be used on site over the mine life: <br /> 1 or 2 Front end loaders <br /> 1 or 2 Bulldozers <br /> - i Motor Grader <br /> 1 Scrapper <br /> Track hoe <br /> 1 Water truck <br /> 1 Fueling Truck <br /> Several off-road haul trucks <br /> Various 24 ton and 14 ton road haul trucks as necessary to move the permitted <br /> product to market <br /> 9 <br />