The anticipated future average total tonnage sold from the site in any one calendar year is <br /> 250,000 tons.Table D-1 shows a breakdown of the expected average annual production. <br /> Table D-1 <br /> AVERAGE ANNUAL PRODUCTION DISTRIBUTION <br /> Product Tons Sold %Rejection Rate Tons Mined <br /> aturals <br /> Road Base 140,000 0% WPM <br /> Concrete 30,000 10% 33,000 <br /> Asphalt 30,000 40% 42,000 <br /> Pit Run 20,000 0% 20,000 <br /> Washed Aggregate 30,000 10% 33,000 <br /> Total 250,000 7% 268,000 <br /> The total permit area is 191.83 acres. A breakdown of the estimated areas is shown in <br /> Table D-2. <br /> Table D-2 <br /> PERMIT AREA ACREAGES <br /> Phase 1 20.95 Acres <br /> Phase 2 115.44 Acres <br /> Future Bride and Access Area 42.83 Acres <br /> Office, Scales,and Parking 4.16 Acres <br /> Valentine <br /> Office, Scales, and parking 0.12 Acres <br /> Western Gravel <br /> Access Road Valentine 1.67 Acres <br /> Access Road BLM) 2.10 Acres <br /> Access Road Love 4.56 Acres <br /> Total 191.83 Acres <br /> Roads will be constructed,upgraded and maintained with road base and will be <br /> compacted if necessary. The road crosses three pipelines. The pipelines will need to be <br /> protected from the addition load in accordance with the pipeline company guidelines. A <br /> water truck will be used to control dust on road during operation. <br /> Mining will progress starting with Phase 1 and then move to Phase 2. Both Phase I and <br /> Phase 2 will proceed from west to east. As the mining proceeds the overburden is <br /> replaced in the previously mined areas to reclaim the area.By using this method only a <br /> portion of the total pit boundary is exposed at a time. Table D-3 shows the phase <br /> tonnages, life and exposed area per year of each phase based upon the 250,000 tons per <br /> year production(268,000 tons mined). <br /> 8 <br />