My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-10_PERMIT FILE - P2016021 (2)
>
Day Forward
>
Permit File
>
Prospect
>
P2016021
>
2016-08-10_PERMIT FILE - P2016021 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:43 PM
Creation date
8/11/2016 2:51:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2016021
IBM Index Class Name
Permit File
Doc Date
8/10/2016
Doc Name
Application
From
Animas Exploration Services, LLC
To
DRMS
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(FORM 2 - Public filing) <br />Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil thickness is thin to non-existent in the area. Rocky, C horizon soils are generally <br />encountered within 6-12" of the ground surface. In any areas with significant topsoil <br />eve opm n, Ine topsoilwill pi y at tile top -of the dFill site c a. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />When the drill hole is completed, it will be plugged using a sodium bentonite gel. A 10' <br />thick cement plug will cap the top of the drill hole which will be marked with the drill hole <br />NNW and Mte. SurMce casingOil be remove?]o compl-eVily removed will <br />eut off r <br />below the 'and surfaea. Amy d HII hole with aftesion water flow will be eemented <br />fmmhnttnm to ion Surface. drainage will be modifier[ to keep water fmmp nnrling in the <br />vicinity of the drill collar. All drill collars will eventually be covered when the drill pads are <br />reclaimed. <br />Only a singe anti hole will a open at any given time. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />All drill pads will be re-contoured to match the existing topography. The surface will be left <br />rough and where available boulders and logs will be used to minimize erosion and <br />discourage access. The reclaimed areas Will be re-seedM with approved SOM MIRIUMS <br />permitting agencies. <br />11. Describe how roads will be reclaimed or returned to their pre -prospecting (or better) condition: <br />NO ROMA P0214 COnStM-1C-t*O-n Will occur-unrieMhis Nr)' - <br />Alf existing roads on BLM lands covered by this NOI will be water barred where needed to <br />minimize soil erosion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.