Ms. Davis <br /> Page 3 <br /> August 10, 2016 <br /> 9. Additionally,please commit to maintaining the following information, at a minimum, for <br /> seismographic and airblast records: <br /> a. Type of instrument, sensitivity, and the calibration signal of the gain setting or <br /> certification of annual calibration; <br /> b. Exact location of instrument and the date, time and distance from the blast; <br /> c. Name of the person and firm taking the reading; <br /> d. Name of the person and firm analyzing the seismographic record; <br /> e. The vibration and/or airblast level record. <br /> Reclamation Plan <br /> 10. The Technical Revision application does not propose any changes to the Reclamation Plan as <br /> it pertains to the level area below the highwall where processing activities previously <br /> occurred. This portion of the mine site was heavily impacted by flooding in 2013 and <br /> currently is covered with sediment and cobble. The current Reclamation Plan calls for <br /> reclaiming this area to rangeland. The area was previously affected by mining operations and <br /> must be reclaimed. Please describe how the Operator intends to reclaim this portion of the <br /> quarry. Also, see additional comments under Item No. 1. <br /> 11. The Reclamation Plan calls for constructing stormwater diversion ditches. Please <br /> affirmitively state that the Operator has acquired a discharge permit from the Water Quality <br /> Control Division of the Colorado Department of Public Health and Environment. <br /> 12. The Reclamation Plan calls for watering the planted grass species. As required by Rule <br /> 6.4.7(3),please indicate the projected amount of water for the project and identify the source <br /> of the water. <br /> 13. The Applicant is proposing to import 31,460 cubic yards of soil growth medium, which will <br /> cover 39 acres with six inches of topsoil. The current Reclamation Plan calls for replacing <br /> twelve inches of topsoil over the affected area. Please provide a technical justification for <br /> reducing the depth of topsoil/plant growth medium from twelve to six inches. <br /> 14. The Technical Revision states the reclaimed areas will be covered with a layer of growth <br /> medium(i.e. onsite topsoil,biosolids, or compost). The Reclamation Cost Estimate includes <br /> a cost for importing 31,460 cubic yards of soil growth medium. Please clarify if there is any <br /> available onsite soils which will be used during reclamation and specify the volume as cubic <br /> yards. In addition, please specify if the material to be imported will be topsoil, biosolids or <br /> compost and identify the source of this material. <br /> 15. The Reclamation Plan states a soil analysis will be made to more exactly determine fertilizer <br /> needs. Please commit to conducting a soil analysis prior to seeding the site and commit to <br /> providing the results of the soil analysis to the Division for review. <br />