My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-09_REVISION - C2009087 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2016-08-09_REVISION - C2009087 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:41 PM
Creation date
8/9/2016 12:52:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Revision
Doc Date
8/9/2016
Doc Name
Application
From
Peabody Sage Creek Mining, LLC
To
DRMS
Type & Sequence
TR9
Email Name
JLE
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oF.Coto <br />ye 25 COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY _ <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-35RECEJ Z.D <br />* 1876 76 �` <br />APPLICATION FORM FOR A REVISION AUG 0 9 ZU16 <br />TO A COAL MINING AND RECLAMATION PERMIT OF RECLAMATION <br />NWG AND SAFETY <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule <br />1.04(73), technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule <br />1.04(90). All revisions are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, <br />including maps, must be submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised <br />sections, maps, tables and/or figures, with a revised table of contents, if necessary. The revision <br />submittal date should be printed in the lower right corner of each revision page. A cover letter to the <br />revision should explain the nature of the revision and reference the specific permit sections being <br />revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal <br />mailing list (except OSM) at the same time the application is submitted to the Division, and proof of <br />distribution must be submitted to the Division along with the application. Copies of revision pages <br />modified during the review process must be distributed in the same manner, along with proof of <br />distribution. Proof of distribution must be submitted prior to implementation of the revision. <br />Permit No.: <br />Permittee: <br />C - 2009 - 087 Date: July 28, 2016 <br />Peabody Sage Creek Mining, LLC <br />Street: 36600 Routt Countv Road <br />City: Ha <br />State: CO <br />Brief Description of Revision: <br />Zip Code: 81639 - <br />TR09, Hydrology Monitoring Plan Changes <br />Public Notice Attached: Yes x No (Required for PRs and TRs) <br />Bond Increase: Yes No x Federal x Non -Federal Mine <br />Proposed Change in: <br />Permit Area <br />Mineral <br />Surface <br />Ownership <br />Ownership <br />Disturbed (+/-) <br />0 0 Acre <br />Private (+/-) <br />0 0 Acres Private (+/-) 0 0 Acres <br />s <br />Permit (+/-) <br />0 0 Acre <br />Federal (+/-) <br />0 0 Acres Federal (+/-) 0 0 Acres <br />s <br />Affected (+/-) <br />0 0 Acre <br />State (+/-) <br />0 0 Acres State (+/-) 0 0 Acres <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.