My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2016-08-08_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:34 PM
Creation date
8/9/2016 8:42:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
8/8/2016
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Tri-State Generation and Transmission
Permit Index Doc Type
Findings
Email Name
JRS
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />PR-04, Colowyo Coal Mine C1981-019 6 August 2016 <br /> <br />STIPULATION 19: <br />DEWATERING WELL PERMITS MUST BE IN PLACE, AND A MINOR REVISION BE <br />SUBMITTED AND APPROVED BY THE DIVISION TO UPDATE SECTION 2.03.10 OF <br />VOLUME 1 OF THE PERMIT APPLICATION PACKAGE, BEFORE ANY DISTURBANCE <br />ASSOCIATED WITH THE COLLOM PIT BOX CUT IS ALLOWED TO OCCUR. <br /> <br />STIPULATION 20: <br />A DISCHARGE PERMIT FOR WATER PUMPED FROM THE DEWATERING WELLS <br />MUST BE IN PLACE, AND A MINOR REVISION TO THE PERMIT SUBMITTED AND <br />APPROVED BY THE DIVISION TO UPDATE SECTION 2.03.10 OF VOLUME 1 OF THE <br />PERMIT APPLICATION PACKAGE, BEFORE ANY DISTURBANCE ASSOCIATED WITH <br />THE COLLOM PIT BOX CUT IS ALLOWED TO OCCUR. <br /> <br />STIPULATION 21: <br />COLOWYO COAL COMPANY WILL CONSTRUCT GROUNDWATER POINT OF <br />COMPLIANCE MLC-04-02, AND CARRY OUT STANDARD WELL TESTS TO ESTIMATE <br />AQUIFER PROPERTIES. FOLLOWING COMPLETION OF THE WORK A MINOR <br />REVISION WILL BE SUBMITTED TO UPDATE THE PERMIT APPLICATION PACKAGE <br />WITH A COMPLETE DESCRIPTION OF THE WELL, AND TO UPDATE TABLES 2.04.7- <br />38, -39, -40 AND -42. MAPS 10B AND 11C SHOULD ALSO BE UPDATED. THESE <br />ACTIONS MUST BE COMPLETED BEFORE THE END OF CALENDAR YEAR 2016. <br /> <br />STIPULATION 22: <br />CONDUCT ADDITIONAL BASELINE ASSESSMENTS OF ALL SITES ELIGIBLE TO BE <br />NATIONAL REGISTER OF HISTORIC PLACES AND “NEED DATA” SITES WITHIN THE <br />PROPOSED COLLOM PERMIT EXPANSION AREA BOUNDARY. <br /> <br />This Decision is based on a finding that the operations will comply with all requirements of the <br />Colorado Surface Coal Mining Reclamation Act, C.R.S. 34-33-101 et seq., and the Rules <br />promulgated pursuant to the Act. Public notice of this proposed Decision will be published for <br />two consecutive weeks in the Craig Daily Press. If no request for a formal hearing is made <br />within thirty (30) days of the first publication of the public notice of this proposed Decision, then <br />this Decision becomes final. The Division has calculated the amount of the reclamation bond to <br />be posted as a result of PR-04. Upon the issuance of this Decision Colowyo will submit the <br />appropriate bond monies. The Application and all supporting documentation and any stipulations <br />or conditions will become a binding part of the permit. <br /> <br />No coal mining operations may be conducted on any Federal surface or coal until the Secretary <br />of the Interior has approved the proposed mining plan. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.