Laserfiche WebLink
<br /> <br /> <br /> <br />PR-04, Colowyo Coal Mine C1981-019 5 August 2016 <br /> <br />STIPULATION 10: <br />PRIOR TO DISTURBING ANY LANDS ALONG THE WILSON CREEK THE COLOWYO <br />COAL COMPANY SHALL PROVIDE THE DIVISION WITH A DETAILED ANALYSIS <br />AND DISCUSSION OF THE ALLUVIAL VALLEY FLOOR (AVF) THAT HAS BEEN <br />DOCUMENTED IN THE AREA. COLOWYO MUST ALSO PROVIDE A DETAILED PLAN <br />FOR THE RESTORATION OF THE AVF IF AND WHEN IT IS DISTURBED. THIS <br />ANALYSIS MAY BE IN THE FORM OF A STAND-ALONE REVISION OR IT MAY BE <br />CONTAINED IN THE REVISION REQUIRED IN STIPULATION 3. ANY REVISION <br />SUBMITTED MUST BE APPROVED BY THE DIVISION PRIOR TO ANY <br />DISTURBANCE. <br /> <br />STIPULATION 15: <br />PRIOR TO DISTURBANCE OF THE COLLOM FACILITIES AREA, COLOWYO MUST <br />REEVALUATE SEDIMENT CONTROL STRUCTURES IN ACCORDANCE WITH RULES <br />4.05.2, 4.05.5, AND 4.05.6. IN PARTICULAR, TWO AREAS IN COLLOM THAT WERE <br />PLANNED FOR SAE STATUS, NAMELY THE 9.8-ACRE CORNER OF THE SHOP AREA <br />AND THE 7.2-ACRE AREA OUTSIDE DEER DRAW, REQUIRE AN ALTERNATIVE PLAN. <br />THESE AREAS MUST BE REMOVED FROM THE DISTURBED AREA OR RUNOFF FROM <br />THESE AREAS MUST BE ROUTED TO SEDIMENT PONDS. THIS WILL REQUIRE RE- <br />SUBMITTAL OF THE ASSOCIATED FIGURES, TEXT, AND EXHIBITS FOR SEDCAD <br />RUNS. <br /> <br />STIPULATION 17: <br />THE OPERATOR SHALL SUBMIT AS MINOR REVISIONS TO THE PERMIT THE <br />FINDINGS OF ARCHAEOLOGIC REPORTS AS REQUIRED BY PR3 PERMIT <br />COMMITMENTS IN EXHIBIT 5, INTO THE PERMIT FOR INCLUSION INTO EXHIBIT 5 <br />(THE CULTURAL RESOURCES INVENTORY). <br /> <br />Stipulations 18, 19, 20, 21, and 22 were added to the permit as result of PR-04. <br /> <br />STIPULATION 18: <br />COLOWYO COAL COMPANY WILL CONSTRUCT A GROUNDWATER MONITORING <br />WELL COMPLETED IN THE TROUT CREEK SANDSTONE. FOLLOWING COMPLETION <br />OF THE WORK, A MINOR REVISION WILL BE SUBMITTED TO UPDATE THE PERMIT <br />APPLICATION PACKAGE WITH A COMPLETE DESCRIPTION OF THE WELL, AND TO <br />UPDATE TABLES 2.04.7-38, -39, -40 AND -41, AND MAPS 10B AND 11C. THE REVISION <br />WILL BE SUBMITTED NO MORE THAN 90 DAYS AFTER WELL COMPLETION. THESE <br />ACTIONS MUST BE COMPLETED BEFORE ANY DISTURBANCE ASSOCIATED WITH <br />THE COLLOM PIT BOX CUT IS ALLOWED TO OCCUR. <br /> <br />