Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 Pagel of 2 <br />BULLDOZER WORK <br />Task description: Replace Topsoil at Admin Building <br />Site: Colowyo Coal Mine Permit Action: TR107 Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 8/5/2016 County: Moffat <br />User: ZTT <br />Agency or organization name <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />1 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Utilization % <br />$97.48 NA <br />Abbreviation: None <br />Filename: C019-002 <br />$103.60 <br />100 <br />$12.31 <br />NA <br />$7.10 <br />100 <br />$38.89 <br />NA <br />$259.38 <br />$259.38 <br />MATERIAL QUANTITIES <br />Source <br />Initial Volume: <br />2,300 <br />Swell factor: <br />1.000 <br />Loose volume: <br />2,300 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 125 feet <br />Unadjusted hourly production: 1,055.6 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />5% <br />7,600 feet <br />2,550 lbs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.900 <br />(AB.AVG.) <br />Material consistency: 1.000 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />Visibility: 1.000 <br />AVG.) <br />