My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-05_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2016-08-05_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2016 10:04:25 AM
Creation date
8/8/2016 6:37:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
8/5/2016
Doc Name
Adequacy Review
From
DRMS
To
Colowyo Coal Company
Type & Sequence
TR107
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task # 001 Page 3 of 3 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />7000.00 <br />-1.00 <br />3.00 <br />2.00 <br />3328 <br />2.995 <br />Haul Time: 2.995 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade (%) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />(%) <br />(%) <br />(fpm) <br />Time <br />min <br />1 <br />7000.00 <br />1.00 <br />3.00 <br />4.00 <br />3411 <br />2.532 <br />Return Time: 2.532 minutes <br />Total Truck Cycle Time: 8.945 minutes <br />Loading Tool unit <br />Production 4,730.51 LCY/Hour Adjusted for job efficiency: 3,926.32 LCY/Hour <br />Truck Unit Production <br />1,173.12 LCY/Hour Adjusted for job efficiency: 973.69 LCY/Hour <br />Optimal No. of Trucks: 4 Truck(s) Selected Number of Trucks: 3 Truck(s) <br />Adjusted hourly truck team production: 2,921.07 LCY/Hour <br />Adjusted single truck/loader team production: 2,921.07 LCY/Hour <br />Adjusted multiple truck/loader team production: 5,842.14 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 2 Team(s) <br />Unit cost: $1.287 /LCY <br />Total job time: 0.39 Hours <br />Total job cost: $2,961 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.