Laserfiche WebLink
Mobilization Worksheet Cont'd Task#003 Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: DENVER <br /> Total one-way travel distance: 37.00 miles <br /> Average Travel Speed: 45.00 mph <br /> Total Non-Roadable Mob/Demob Cost <br /> `*two round trips with haul rig: _S3,025.56 <br /> Total Roadable Mob,Demob Cost** <br /> **one round trip,no haul rig: _ $0.00 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> E ui ment i E ui ment <br /> Haul Time(Hours): 0.82 0.82 <br /> Return Time(Hours): 0.82 0.82 <br /> Loading Time(Hours): 0.50 NA_ <br /> Unloading Time(Hours): 0.50 - NA <br /> Subtotals: 1.64 <br /> JOB TIME AND COST <br /> Total job time: 5.29 Hours <br /> Total job cost: $1,026 <br /> CIRCES Cost Estimating Software <br />