My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-04_REVISION - M1987072
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987072
>
2016-08-04_REVISION - M1987072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:45:28 AM
Creation date
8/5/2016 9:00:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987072
IBM Index Class Name
Revision
Doc Date
8/4/2016
Doc Name
Notice of Financial Warranty Increase
From
DRMS
To
Thomas Musch
Type & Sequence
SI3
Email Name
MAC
WHE
BJC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 2 <br /> EQUIPMENT MOBILIZATIONTEMOBILIZATION <br /> Task description: Equipment Mobilization <br /> Site: Lee No 2 Placer Permit Action: 2016 Bond Calculation Permit/3ob#: M1987072 <br /> PROJECT IDENTIFICATION <br /> Task#: 003 State: Colorado Abbreviation: None <br /> Date: 2/1/2016 County: Gilpin — Filename: M072-003 <br /> User: MAC <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: I per dayr_ <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4, DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rai Capacities 0-25 Tons T_ 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: —$16.63 $18.37 $22.33 <br /> Operating Cost/Hour. $44.38 $46.13 $50.07 <br /> O erator Cost/Hour: T $27.66 $27.66 $27.66 <br /> _ Helper Cost/Hour: $0.00 3 $25.39 $25.39 <br /> Total Unit Cost/Hour: 1 $88.67 $l 17.55 y $125.45 <br /> NON ROADABLE EQUIPMENT: <br /> Machine _ Weight Owner ship Haul Rig Fleet 1 Haul Trip Return Trip DOT Permit <br /> Description Unit I Costhr/unit Costhr/uni i Size ' Costhr/ Costhr/fleet Cost fleet <br /> I <br /> (TONS)_ _� _ _t _ � fleet _ <br /> t D3K XL-3P 9.22 S 15.53 � 588.67 -i S t+ 04.20 S88.67 _ $250.00 <br /> Ca <br /> — -- 1 -- L__ _ _ 1 _— <br /> Subtotals: $104.20 i $88.67 $250.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description �l Total Costhr/ Fleet Size Haul Trip Return Tri I p <br /> unit I Costhr'fleet Costhr/fleet <br /> Subtotals: $3.00 $0.00 1 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.