Laserfiche WebLink
7195459437 <br />03:34.29 p.m. 08-03-2016 3A <br />Page 2 <br />Colorado Division of Reclamation <br />Mining & Safety <br />Pueblo County Planning and Development <br />Board of Pueblo County Commissioners <br />August 3, 2016 <br />event which may occur in the vicinity of the Ditch. Likewise, we urge you to <br />insure that no drainage constructed along the haul route or from the gravel pits <br />will result in any runoff Into the Ditch. if you approve this gravel mining project, <br />we also urge you to include a condition that no mining activity or material <br />stockpiles are allowed within 1,000 feet of the centerline of the Ditch. <br />Your careful attention to the design and construction of the proposed <br />bridge across the Ditch will likewise be most appreciated. Again, the Board does <br />not want to expose its maintenance personnel to any safety hazards, nor does it <br />wish to expose the Ditch to any structural damage or pollution, any of which <br />could occur in the event of a bridge failure and/or a truck going into the Ditch. <br />These concerns are expressed in accord with the Board's fiduciary <br />responsibilities to the Company and its shareholders. The Board takes no <br />position either in favor of or opposed to the ultimate granting or denying of Permit <br />No. M2016009. <br />On behalf of the Board of Directors, we thank you for your time, attention <br />and consideration in this matter. <br />Sincer ly, <br />,John J. Keilb h <br />