My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-01_REVISION - M1993035
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1993035
>
2016-08-01_REVISION - M1993035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2020 3:58:54 AM
Creation date
8/2/2016 11:18:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993035
IBM Index Class Name
Revision
Doc Date
8/1/2016
Doc Name
Request for Technical Revision
From
Summit County Colorado
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS (CONTINUED) <br /> 9.2.3 Divert Swan River...................................................................................................24 <br /> 9.2.4 Improve Tailings Cover.................................................... .....................................25 <br /> 9.2.5 Cover Stream-side Tailings............................................................... ....................25 <br /> 9.2.6 Institutional Controls..............................................................................................26 <br /> 9.3 Permits..................................•--................------..................----..........................26 <br /> 9.4 Public Notice....................................................................................•----..........27 <br /> 9.5 Achievement of Objectives..............................................................................27 <br /> 9.5.1 Effectiveness.......................•---..................---..........................................................27 <br /> 9.5.2 Implementability.....................................................................................................28 <br /> 9.5.3 Compliance with ARARs........................................................................................28 <br /> 9.5.4 Long-term Effectiveness and Permanence............................................................28 <br /> 9.5.5 Short-term Effectiveness.................................................................................. <br /> 9.5.6 Community Acceptance.........................................................................................29 <br /> 9.6 Verification Monitoring and Sampling..............................................................29 <br /> 9.6.1 Improvement of Add Conveyance..........................................................................29 <br /> 9.6.2 Creation of Wetlands..............................................................................................30 <br /> 9.6.3 Swan River Diversion.............................................................................................30 <br /> 9.6.4 Fine-grained Tailings Cover Improvements...........................................................30 <br /> 9.6.5 Grading and Rock-Cover Construction..................................................................31 <br /> 9.6.6 Institutional Controls...............................................................................................31 <br /> 9.6.7 Surface-wafer Sampling............................................................................ <br /> 9.7 Schedule.................................................................•---•---................................32 <br /> 9.8 Completion Report..........................................................................................32 <br /> 9.9 Ongoing Inspection and Maintenance.............................................................32 <br /> 10. REFERENCES...................................................................................................33 <br /> LIST OF TABLES <br /> Table 1. CDPHE Source Dimensions and Volumes <br /> Table 2. CDPHE Waste Source Sample Analytical Results <br /> Table 3. CDPHE Acid-Base Accounting and SMP Buffering Capacity Results <br /> Table 4. CDPHE Toxicity Characteristic Leaching Procedure(TCLP)Results <br /> Table 5.ABC Waste Source Analytical Results <br /> Table 6. CDPHE Adit Discharge Results,Dissolved Metals <br /> Table 7.ABC Adit Discharge Results <br /> Table 8. CDPHE Analytical Results from Surface-Water Samples <br /> Table 9.ABC Analytical Results from Surface-Water Samples <br /> Table 10. CDPHE Analytical Results from Sediment Samples <br /> Table 11. CDPHE Analytical Results from Soil Samples <br /> LIST OF FIGURES <br /> Figure 1. Site Location Map <br /> Figure 2. Detailed Sample Location Map <br /> Figure 3. Locations of Remediation Elements <br /> ATTACHMENTS <br /> Attachment A:Statements of Qualifications and Resumes of Qualified Environmental <br /> Professionals <br /> Attachment B: CDPHE Environmental Assessment Report,August 2002 <br /> 1;"O-; l Tger VCUP <br />
The URL can be used to link to this page
Your browser does not support the video tag.