Laserfiche WebLink
M-1980-244/Amendment 11 Adequacy Review Responses to <br /> DRMS Adequacy Review Comments to the <br /> Hydrology and Hydrogeochemistry Reports <br /> Dated July 28,2016 <br /> RESPONSES <br /> VOLUMEII OF IV...........................................................................................................................................2 <br /> HYDROGEOCHEMISTRY EVALUATION/DECEMBER 15,2015 /ADRIAN BROWN....................2 <br /> ATTACHMENT 3 —DEEP CARBONATE GEOCHEMISTRY EVALUATION/ADRIAN BROWN 13 <br /> ATTACHMENT 4—GROUNDWATER FLOW MODEL/PREPARED: FEBRUARY 27, 2012/ <br /> ADRIANBROWN.....................................................................................................................................13 <br /> APPENDIX 2—HYDROLOGIC EVALUATION, CC&V/DECEMBER 2015......................................14 <br /> VOLUMEI OF IV..........................................................................................................................................24 <br /> EXHIBIT G—WATER INFORMATION..................................................................................................24 <br /> PROJECT DESCRIPTION.........................................................................................................................25 <br /> ATTACHMENTS <br /> Attachment 1 —Updated Plates for the Adrian Brown Report <br /> Plate 4—with addition of drainage tunnels <br /> Plate 9—Groundwater Flow/Contours <br /> Plate 17—Grassy Valley Groundwater Flow <br /> Attachment 2—Updated Figures/Tables for Hydrology Report and Project Description <br /> Figure 1-1 —Extent of Permitted Activities <br /> Figure 2-1 —Site-wide—Surface and Groundwater Locations <br /> Figure 2-1 a—Permit Area Detail—Surface Water and Groundwater Locations <br /> Figure 2-lb—Carlton Tunnel Detail—Surface Water and Groundwater Locations <br /> Table 1 —Surface Water Locations(Compliance) <br /> Table 2—Groundwater Locations(Compliance and Other) <br /> Table 3 —All Surface Water Locations(Compliance and Other) <br /> Attachment 3 —Humidity Cell Test Results(to date) <br /> Attachment 4—Updates to Exhibit G <br /> Revised Figure G-1 <br /> Table 4: List of Wells, Status and Location in Permit Area and Within 200 foot Buffer <br /> Page 1 of 28 <br />