Laserfiche WebLink
be compliance sites. Please provide a list of all compliance surface water and <br /> groundwater monitoring sites,including the GPS coordinates for each location. <br /> Additionally, because you are providing data from other(non-compliance) <br /> monitoring sites, please show the locations of these sites either on Figure 2-1 <br /> (differentiating them from compliance sites) or on a separate figure. <br /> RESPONSE: A list of compliance monitoring points for both surface and groundwater is <br /> provided in Tables 1 and 2 in Attachment 2 along with coordinates for each. A revised <br /> Figure 2-1 also is provided, which shows the compliance monitoring points and other <br /> monitoring locations. Note Figure 2-1 provides a site-wide view of the entire monitoring <br /> area. Figures 2-1 a and 2-1 b (also included in Attachment 2) show the monitoring <br /> locations within the permit area detail and the Carlton Tunnel, respectively. <br /> 3.1.3.1 Monitoring Program <br /> • Page 8: The text lists 3 groundwater monitoring wells, including WCMW-02, WCMW-03, <br /> and WCMW-06. However, only WCMW-03 and WCMW-06 are shown on Figure 2-1. <br /> Please revise Figure 2-1 to show locations of all monitoring sites discussed in this <br /> section. <br /> RESPONSE: As noted above, a revised Figures 2-1, 2-1 a and 2-1 b are included in <br /> Attachment 2. <br /> 3.1.4 Current Conditions <br /> • Page 10: The text states that the Vindicator Valley drainage is shown on Figure 1-1. <br /> However,this drainage is not labeled on Figure 1-1. Please revise Figure 1-1 to label <br /> this drainage. <br /> RESPONSE. A revised Figure 1-1 is provided in Attachment 2, which shows the <br /> different drainages mentioned in the report. <br /> • Page 11: The text indicates that multiple EMPs may exist for Vindicator Valley. <br /> However, Figure 1-1 appears to show only EMP-012. Is EMP-012 the only EMP <br /> associated with Vindicator Valley? <br /> RESPONSE. The text of the report refers generally to the use of EMPs at the site <br /> including EMP-012, which is located in Vindicator Valley. Note that EMPs are the <br /> final terminus control for stormwater management at the site. Several BMPs are <br /> installed upstream of the EMPs. Detailed stormwater designs have been conducted <br /> for each drainage at the site and appropriate BMPs and EMPs installed. The <br /> stormwater controls for Vindicator Valley Creek drainage were designed and <br /> constructed pursuant to past permit amendments and captured in the site-wide <br /> Stormwater Management Plan, a copy of which was included as Appendix 12 to the <br /> Amendment 10/MLE2 permit. EMP ponds are constructed for twice the volume of <br /> the 10 year/24 hour storm event. There are no changes proposed for Vindicator <br /> Valley under Amendment IL As such, no additional stormwater designs were <br /> considered. <br /> 4—Cripple Creek and Tributaries <br /> 4.1.1 Current Conditions <br /> • Page 14: The text states that the Poverty Gulch drainage is shown on Figure 1-1. <br /> However,this drainage is not labeled on Figure 1-1. Please revise Figure 1-1 to label <br /> this drainage. <br /> RESPONSE: A revised Figure 1-I is provided in Attachment 2 with the different <br /> drainages mentioned in the report labeled. <br /> Page 16 of 28 <br />