Laserfiche WebLink
WORWEST ENGINEERING EVALUATION OF FT CARBON <br /> JULY 28,2016 <br /> COR PORAT ION PAGE 3 OF 3 <br /> MEMORANDUM <br /> access road construction will not impact the fence or the gate. The Fort Carson access road will be <br /> impacted by the construction of an acceleration lane, but all construction will be permitted with CDOT, <br /> completed in cooperation with CDOT, and will occur within the Highway 115 right-of-way. Thus, <br /> construction of the access road will not impact use of the road, gate, or fence on Fort Carson. <br /> Engineer Certification <br /> This engineering evaluation of Highway 115 is complete and accurate to the best of my knowledge. <br /> pQ��a Q.•��CF <br /> 40848 <br /> Pz <br /> rss��NAL��G <br />