My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-28_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-28_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 12:03:04 PM
Creation date
7/29/2016 10:15:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/28/2016
Doc Name
Adequacy Review
From
DRMS
To
CC&V
Type & Sequence
TR80
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Jack Henris <br />July 28, 2016 <br />Page 2 <br />m:\min\tc1\_teller\m-1980-244 cc-v\tr-80 tempwtrline\m-80-244-tr80par2016-07-28.docx <br /> Lines to be identified in Comment No. 2 (shown by arrows) <br />3) Pipe Specifications. The pipe specifications indicate the discharge pressure at the pump <br />is expected to be 275 psig. Two specifications are given for 8-inch diameter HDPPE <br />pipe: DR 11 and DR 07. A quick reference to HDPE pipe standard specifications <br />indicate DR 07 is rated for 333 psi. However DR 11 is rated for 200 psi. Please explain <br />why how the two different pipes will be installed to ensure adequate pressure ratings <br />for the system. <br />4) Schedule. The schedule indicates “replacement fresh water line from Grassy Valley is <br />expected to be in place by the middle of November 2016, minimizing freezing <br />concerns.” The Division is concerned about potential delays in construction for the <br />permanent replacement line. How does CC&V intend to mitigate potential problems <br />due to freezing if there is a significant delay in the construction of the permanent water <br />line? <br />5) Reclamation cost estimate. The TR-80 submittal did not include a demolition cost for <br />the temporary water line. Please provide a demolition cost estimate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.