My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-28_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-28_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2016 12:03:04 PM
Creation date
7/29/2016 10:15:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/28/2016
Doc Name
Adequacy Review
From
DRMS
To
CC&V
Type & Sequence
TR80
Email Name
TC1
ERR
AME
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br /> <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us <br />John W. Hickenlooper, Governor | Robert Randall, Executive Director | Virginia Brannon, Director <br /> <br />July 28, 2016 <br /> <br />Mr. Jack Henris <br />Cripple Creek & Victor Gold Mining Company <br />100 N. Third Street <br />P.O. Box 191 <br />Victor, CO 80860 <br /> <br />Re: Project, Permit No. M-1980-244; <br /> Technical Revision (TR-80) Preliminary Adequacy Review <br /> <br />Dear Mr. Henris: <br /> <br />On July 25, 2016 the Division of Reclamation, Mining and Safety received a request for a Technical <br />Revision (TR-80) addressing the following: <br /> <br /> Installation of a temporary fresh water line to the water to the High Grade Mill <br /> <br />The submittal was called complete for the purpose of filing on July 25, 2016. The decision date for <br />TR-80 is August 24, 2016. Please be advised that if you are unable to satisfactorily address any <br />concerns identified in this review before the decision date, it will be your responsibility to request <br />an extension of the review period. If there are outstanding issues that have not been adequately <br />addressed prior to the end of the review period, and no extension has been requested, the Division will <br />deny this Technical Revision (TR). <br /> <br />The following comments are based on the Division’s review of the request for TR-80: <br />1) Pipe Route and Figure 1. The text and Figure 1 discuss the temporary fresh water source <br />being the Altman Pump Station and a light blue line cite the Bull Hill Line and Pipeline <br />E are involved in the conveyance of fresh water from the Altman Pump Station. The <br />Division needs to clarify the portion of the proposed system which is both temporary <br />and not yet constructed. Mr. Erik Munroe was in the DRMS office this afternoon and <br />was able to help clarify what is temporary. Based on the discussion with Mr. Munroe, <br />the Division understands that the Light blue line shown in Figure 2 is the extent of the <br />proposed temporary fresh water pipe to be constructed. Please confirm the light blue <br />line on Figure represents the extent of the proposed temporary pipeline. <br />2) Figure 2. There is a thick black line and a dark blue line on Figure 2. Please indicate <br />what these lines represent (see image on page 2).
The URL can be used to link to this page
Your browser does not support the video tag.