Laserfiche WebLink
Page 60 of 371 <br /> <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Haul refuse out of Gob Pile #2/#3 drying areas for placement <br />Site: Bowie No. 2 Mine Permit Action: SL1 Permit/Job#: C1996083 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 040 State: Colorado Abbreviation: None <br />Date: 3/8/2016 County: Delta Filename: C083-040 <br />User: JDM <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Generic 10-12 cy, 6x4 <br />-Loader: Cat 345D L 12’-10” Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: NA <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Excavator Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization-machine: 100 100 NA NA NA NA <br />Ownership cost/hour: $12.83 $58.18 NA NA NA NA <br />Operating cost/hour: $54.86 $101.39 NA NA NA NA <br />Ripper op. cost/hour: NA $0.00 NA NA NA NA <br />Operator cost/hour: $0.00 $35.36 NA NA NA NA <br />Unit Subtotals: $67.69 $194.94 NA NA NA NA <br />Number of Units: 2 1 0 0 0 0 <br />Group Subtotals: Work: $330.32 Support: $0.00 Maint: $0.00 <br />Total work team cost/hour: $330.32 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 325,000 CCY Swell factor: 1.000 <br />Loose volume: 325,000 LCY <br />Source of estimated volume: Vol XI, p. 4a, Vol IX p 12-all 225k yds @ #3, 100k yds @ #2 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00