My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-25_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2016-07-25_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:06 PM
Creation date
7/26/2016 8:08:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
7/25/2016
Doc Name
Findings of Fact, Conclusions of Law and Order
From
DRMS
To
Bowie Resources, LLC
Permit Index Doc Type
Findings
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 59 of 371 <br /> <br />CIRCES Cost Estimating Software <br />COMPACTION WORK <br /> <br />Task description: Compact Refuse on Gob Pile #2 <br />Site: Bowie No. 2 Mine Permit Action: SL1 Permit/Job#: C1996083 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 039 State: Colorado Abbreviation: None <br />Date: 3/8/2016 County: Delta Filename: C083-039 <br />User: JDM <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Deleted - CAT 815F Horsepower: 240 <br />Compactor Type: Soil - tamping foot Shift Basis: 1 per day <br /> Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $36.81 NA <br />Operating Cost/Hour: $80.53 100 <br />Operator Cost/Hour: $34.94 NA <br />Total Unit Cost/Hour: $152.28 <br />Total Fleet Cost/Hour: $152.28 <br /> <br />MATERIAL QUANTITIES <br />Loose volume: 200,000 LCY Shrinkage factor: 0.900 <br />Compacted volume: 180,000 CCY <br />Source of estimated volume: Page 2.05-45 <br />Source of estimated shrinkage factor: Cat Handbook <br /> <br />HOURLY PRODUCTION Unadjusted hourly production = (W x S x L x C) / P <br />Compacted width per pass (W): 6.50 feet <br />Average Compactor Speed (S): 4.00 mph <br />Compacted thickness of each lift (L): 10.00 inches <br />Conversion Constant (C): 16.3 (5,280ft./12in./27cu.ft.) <br />Required number of machine passes (P): 3 passes <br />Unadjusted Hourly Unit Production: 1,412.67 CCY/hour <br />Job Condition Correction Factors Site Altitude: 6,100 feet <br /> Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.8300 multiplier <br />Adjusted Hourly Unit Production: 1,172.51 CCY/Hour <br />Adjusted Hourly Fleet Production: 1,172.51 CCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Compactor(s) Total job time: 153.52 Hours <br /> <br />Unit cost: <br /> <br />$0.130 <br /> <br />per CCY <br /> <br />Total job cost: <br /> <br />$23,377
The URL can be used to link to this page
Your browser does not support the video tag.