My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-25_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2016-07-25_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:06 PM
Creation date
7/26/2016 8:08:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
7/25/2016
Doc Name
Findings of Fact, Conclusions of Law and Order
From
DRMS
To
Bowie Resources, LLC
Permit Index Doc Type
Findings
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 14 of 371 <br /> <br />CIRCES Cost Estimating Software <br /> <br />BULLDOZER WORK <br /> <br />Task description: Regrade D-Portal Bench <br />Site: Bowie No. 2 Mine Permit Action: Post SL1 Permit/Job#: C1996083 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado Abbreviation: None <br />Date: 4/11/2016 County: Delta Filename: C083-002 <br />User: JDM <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D10T - 10SU <br />Horsepower: 574 <br />Blade Type: Semi-Universal <br />Attachment: NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $133.56 NA <br />Operating Cost/Hour: $173.02 100 <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $345.47 <br />Total Fleet Cost/Hour: $1,381.88 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 260,593 <br />Swell factor: 1.165 <br />Loose volume: 303,591 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly <br />production: <br />1,718.9 LCY/hr <br /> <br />Materials consistency description: Compacted fill or embankment 0.9 <br /> <br />Average push <br />gradient: <br />10 % <br />Average site altitude: 6,900 feet <br /> <br />Material weight: 2,900 lbs/LCY <br /> <br />Weight description: Decomposed rock - 50% Rock, 50% Earth
The URL can be used to link to this page
Your browser does not support the video tag.