Laserfiche WebLink
Page 13 of 371 <br /> <br />CIRCES Cost Estimating Software <br />Truck Exchange Time: 0.70 Minutes Adjusted for site altitude: 0.700 Minutes <br />Truck Load Time: 3.520 Minutes Adjusted for site altitude: 3.520 Minutes <br />Truck Maneuver and Dump <br />Time: <br />1.10 Minutes Adjusted for site altitude: 1.100 Minutes <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 600.00 17.00 3.00 20.00 379 1.588 <br />Haul Time: 1.588 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 600.00 -17.00 3.00 -14.00 1377 0.566 <br />Return Time: 0.566 minutes <br />Total Truck Cycle Time: 7.474 minutes <br />Loading Tool unit <br />Production <br /> <br />600.89 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />498.74 <br /> <br />LCY/Hour <br />Truck Unit Production <br />339.28 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />281.60 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 563.20 LCY/Hour <br />Adjusted single truck/loader team production: 498.74 LCY/Hour <br />Adjusted multiple truck/loader team production: 498.74 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 609.56 Hours <br /> <br />Unit cost: <br /> <br />$1.433 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$435,695