My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-25_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2016-07-25_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:06 PM
Creation date
7/26/2016 8:08:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
7/25/2016
Doc Name
Findings of Fact, Conclusions of Law and Order
From
DRMS
To
Bowie Resources, LLC
Permit Index Doc Type
Findings
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 371 <br /> <br />CIRCES Cost Estimating Software <br />106l Plug and seal B-BURN-DH-16 BOREHOLE 1 7.00 -$1,918.65 <br />106m Plug and seal B-BURN-DH-17 BOREHOLE 1 8.00 -$1,932.46 <br />106n Plug and seal B-BURN-DH-18 BOREHOLE 1 7.00 -$1,894.87 <br />106o Plug and seal B-BURN-DH-19 BOREHOLE 1 8.00 -$2,316.54 <br />106p Plug and seal B-BURN-DH-20 BOREHOLE 1 10.00 -$3,260.61 <br />106q Plug and seal B-BURN-DH-21 BOREHOLE 1 7.00 -$1,902.24 <br />106r Plug and seal KM-3 BOREHOLE 1 12.00 -$4,548.62 <br />106s Plug and seal Gob Pile geotech 1 (MR29) BOREHOLE 1 6.00 -$1,433.71 <br />106t Plug and seal Gob Pile geotech 2 (MR29) BOREHOLE 1 6.00 -$1,265.11 <br />106u Plug and seal Gob Pile geotech 3 (MR29) BOREHOLE 1 6.00 -$1,429.64 <br />106v Plug and seal Gob Pile geotech 4 (MR29) BOREHOLE 1 6.00 -$1,433.71 <br />106w Plug and seal Gob Pile geotech 5 (MR29) BOREHOLE 1 6.00 -$1,429.64 <br />106x Plug and seal Gob Pile geotech 6 (MR29) BOREHOLE 1 6.00 -$1,429.64 <br />106y Plug and seal Gob Pile geotech 7 (MR29) BOREHOLE 1 6.00 -$1,434.48 <br />106z Plug and seal Gob Pile geotech 8 (MR29) BOREHOLE 1 6.00 -$1,429.64 <br />110 Replace Topsoil from Stockpile A to Portal/Utility <br />Bench <br />SCRAPER1 1 652.39 $390,509.00 <br />111 Replace Topsoil from Stockpile A to Truck <br />Loadout/Coal Stkpl <br />SCRAPER1 1 45.95 $27,503.00 <br />112 Replace Topsoil from Stockpile F to Train Loadout SCRAPER1 1 39.98 $23,931.00 <br />113 Replace Topsoil from Stockpile A to B-Seam <br />Portal Bench <br />SCRAPER1 1 87.66 $52,471.00 <br />114 Replace Topsoil fm Stockpile to Freeman Gulch <br />Vent Shaft Pad <br />DOZER 4 0.93 -$1,373.00 <br />115 Replace Topsoil fm Stockpiles C/D to Pond C and <br />Gob Pond D <br />SCRAPER1 1 13.12 $7,851.00 <br />116 Replace topsoil from Stockpile to Pond F DOZER 1 3.95 $1,457.00 <br />117 Replace topsoil from Stockpile F to Pond J SCRAPER1 1 2.85 $1,707.00 <br />118 Replace topsoil from Stockpile F to Pond K SCRAPER1 1 1.92 $1,148.00 <br />119 Replace topsoil fm stockpile to MR/TR Light-Use <br />Roads <br />DOZER 4 3.82 $5631 <br />120 Replace topsoil from stockpiles to MR/TR drill <br />pads <br />DOZER 4 19.25 $27,513 <br />121 Replace topsoil from Stockpile A to Prep Plant <br />Bench <br />SCRAPER1 1 22.41 $13,415.00 <br />122 Replace topsoil from stockpile to Material Storage <br />Area <br />DOZER 4 0.18 $270.00 <br />123 Replace topsoil from Stockpile E to Gob Pile #2 SCRAPER1 1 83.69 $50,098.00 <br />124 Replace Topsoil from Stockpile D to Gob Pile #4 SCRAPER1 1 7.01 $4,197.00 <br />125 Replace topsoil from stockpile to Gob Pile #3 SCRAPER1 1 85.33 $51,078.00 <br />126 Replace topsoil from stockpile to Haul Road DOZER 4 0.17 $247.00 <br />127 Replace topsoil from stockpile to Water Tank <br />Bench <br />SCRAPER1 1 1.71 $1,024.00 <br />128 Replace topsoil from Stockpile G to TR35 <br />road/pad <br />SCRAPER1 1 5.01 $3,001.00 <br />129 Replace topsoil from stockpile to Borrow Area DOZER 4 5.44 $8,018.00 <br />130 Replace topsoil fm stockpile to Upper Parking Lot <br />Expansion <br />DOZER 1 0.46 $160.00 <br />131 Replace topsoil fm stockpile to Hubbard Ck Vent <br />Shaft Pad <br />DOZER 4 0.74 -$1,089.00 <br />140 Seal Portals and Shafts MINESEAL 1 40.00 $102,596.70 <br />141 Concrete Plug and Backfill Shaft MINESEAL 1 20.00 -$62,476.12 <br />150 Drill Seed Mix 3 on Disturbed Area REVEGE 1 40.00 $561,533.00 <br />151 Drill Seed Drill Pads REVEGE 1 334.64 $103,141.00
The URL can be used to link to this page
Your browser does not support the video tag.