Laserfiche WebLink
Page 2 of 371 <br /> <br />CIRCES Cost Estimating Software <br />036 Spread Uncompacted Refuse on Gob Pile #2 DOZER 4 89.54 $123,731.00 <br />037 Spread Uncompacted Refuse at Gob Pile #3 DOZER 4 100.73 $139,198.00 <br />038 Compact Material Hauled to Gob Pile #1 COMPACT 1 13.38 $2,038.00 <br />039 Compact Refuse on Gob Pile #2 COMPACT 1 153.51 $23,377.00 <br />040 Haul refuse out of Gob Pile #2/#3 drying areas for <br />placement <br />TRUCK1 1 909.13 $300,303.00 <br />041 Compact Refuse at Gob Pile #3 COMPACT 1 166.94 $25,423.00 <br />042 Haul Topsoil from Stockpile Area to Gob Pile #1 SCRAPER1 1 2.18 $1,307.00 <br />043 Place 3.5' of Coverfill on Gob Pile #1 SCRAPER1 1 15.80 $9,460.00 <br />044 Place Coverfill from Stockpiles on Gob Pile #2 SCRAPER1 1 173.74 $104,000.00 <br />045 Haul Cover Material from Gob Pile #3 to Gob Pile <br />#2 <br />TRUCK1 1 235.64 $87,599.00 <br />046 Place 2.5' of Coverfill on Gob Pile #3, from <br />stockpile <br />SCRAPER1 1 196.56 $117,655.00 <br />050 Compact Backfilled D-Portal Bench,Roads, & <br />Utility Corridor <br />COMPACT 1 577.52 $87,945.00 <br />051 Compact Backfilled Material at Truck <br />Loadout/Coal Stockpile <br />COMPACT 1 63.35 $9,648.00 <br />052 Compact Backfilled Train Loadout COMPACT 1 215.94 $32,884.00 <br />053 Compact B-Seam Portal Bench COMPACT 1 128.72 $19,603.00 <br />054 Compact Backfilled Freeman Gulch Vent Shaft <br />Pad <br />COMPACT 1 1.83 -$279.00 <br />060 Rip Utility Bench RIPPER 4 0.30 $456.00 <br />061 Rip D-Portal Bench RIPPER 4 3.71 $5,473.00 <br />062 Rip Truck Loadout/Coal Stockpile Area RIPPER 4 2.06 $3,041.00 <br />063 Rip Regraded Mine Area Prior to Topsoil <br />Replacement <br />RIPPER 4 59.09 $87,070.00 <br />064 Rip Train Loadout Facilities and Railbed Benches RIPPER 4 7.69 $11,335.00 <br />065 Rip B-Seam Portal Bench RIPPER 4 3.71 $5,473.00 <br />066 Rip Rock Laydown Pad Topsoil RIPPER 1 0.43 $159.00 <br />070 Rip Haul Roads (Portion Being Reclaimed) & Old <br />Truck Loadout <br />RIPPER 4 116.47 $172,419.00 <br />071 Remove Haul Road Subbase and Place on Gob Pile <br />#1 <br />SCRAPER1 1 30.54 $18,281.00 <br />072 Rip Truck Loadout Road RIPPER 4 2.14 $3,177.00 <br />073 Haul Truck Loadout Subbase to Gob Pile #1 SCRAPER1 1 12.75 $7,630.00 <br />074 Rip Upper Haul Road Asphalt Prior to Road <br />Narrowing <br />RIPPER 4 2.95 $4,369.00 <br />075 Pull Back/Haul Fill Mat'l from Upper Haul Rd <br />Narrowing <br />TRUCK1 1 141.47 $101,119.00 <br />076 Regrade Narrowed Section of Haul Road DOZER 4 26.11 $36,080.00 <br />077 Rip Gob Pile #1 Road RIPPER 4 2.35 $3,493.00 <br />078 Regrade Gob Pile #1 Road DOZER 4 5.17 $7,611.00 <br />079 Rip Access Road RIPPER 4 0.73 $1,091.00 <br />080 Haul Access Road Surface to Gob Pile #1 SCRAPER1 1 4.86 $2,908.00 <br />081 Regrade Access Road DOZER 4 1.79 $2,479.00 <br />082 Rip Freeman Gulch Vent Shaft Light-Use Road RIPPER 4 0.20 -$309.00 <br />083 Backfill and Regrade Haul Road to Gob Pile #2 DOZER 4 0.44 $645.00 <br />084 Rip Lower Haul Road RIPPER 4 0.95 $1,406.00 <br />085 Regrade Lower Haul Road DOZER 4 36.46 $53,715.00 <br />086 Regrade Light Use Roads from MRs and TRs DOZER 4 64.86 $95,566 <br />090 Finish Grade Disturbed Mine Area GRADER 1 129.92 $20,163.00 <br />091 Finish Grade Train Loadout GRADER 1 16.91 $2,625.00 <br />092 Finish Grade B-Seam Portal Bench GRADER 1 6.91 $1,074.00 <br />093 Finish Grade Gob Piles #1, #2, #3, and #4 GRADER 1 50.64 $7,860.00