Laserfiche WebLink
COST SUMMARY WORK <br /> <br />Task description: Summary of Bowie No. 2 Mine Reclamation Tasks Post SL-1 Approval <br />Site: Bowie No. 2 Mine Permit Action: SL1 Permit/Job#: C1996083 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 4/11/2016 County: Delta Filename: C083-000 <br />User: JDM <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Pull back and Haul Portal Bench Fill Material to <br />Cut Slope <br />TRUCK1 1 609.56 $435,695.00 <br />002 Regrade D-Portal Bench DOZER 4 158.03 $218,385.00 <br />003 Pull up Material for Utility Corridor EXCAVATE 2 24.96 -$13,511.00 <br />004 Regrade Utility Corridor DOZER 4 4.48 -$6,193.00 <br />005 Rip and Regrade Material Storage Area at Gob Pile DOZER 4 1.73 $2,392.00 <br />006 Pull Back Material @ Old Truck Loadout Material <br />Storage Area <br />EXCAVATE 2 21.27 $11,512.00 <br />007 Regrade Old Truck Loadout Material Storage Area DOZER 4 8.21 $11,344.00 <br />008 Pull Back Material at Truck Loadout/Coal <br />Stockpile <br />EXCAVATE 2 147.57 $79,869.00 <br />009 Regrade New Truck Loadout and Coal Stockpile DOZER 4 32.38 $44,747.00 <br />010 Pull Material Back onto Train L/O Facil. and <br />Railbed Benches <br />EXCAVATE 2 431.74 $233,667.00 <br />011 Regrade Train Loadout Facilities and Railbed <br />Benches <br />DOZER 4 171.56 $237,074.00 <br />012 Backfill and Regrade Train L/O Overland <br />Conveyor Corridor <br />DOZER 4 5.62 $7,759.00 <br />013 Haul Fill from Upper Mat'l Strge Area to B-Seam <br />Portal Bench <br />SCRAPER1 1 60.63 $36,294.00 <br />014 Haul Fill fr Adj. Mat'l Storage Area to B-Seam <br />Portal Bench <br />TRUCK1 1 89.33 $60,581.00 <br />015 Backfill and Regrade B-Seam Portal Bench DOZER 4 38.70 $57,025.00 <br />016 Pull Material Back onto Freeman Gulch Vent Shaft <br />Bench <br />EXCAVATE 2 2.31 -$1,254.00 <br />017 Push mat'l from Freeman Gulch Vent Shaft back to <br />Cut Slope <br />DOZER 4 0.48 -$659.00 <br />018 Regrade Freeman Gulch Vent Shaft Pad DOZER 4 8.63 -$11,932.00 <br />019 Regrade Drill Pads from MRs and TRs DOZER 4 22.57 $31,183 <br />020 Regrade Material Storage Area from TR-29 DOZER 4 0.48 $663.00 <br />021 Backfill and Regrade New Prep Plant Bench DOZER 4 36.99 $51,120.00 <br />022 Replace Fill from Material Storage Area to Water <br />Tank Bench <br />SCRAPER1 1 1.51 $904.00 <br />023 Regrade Borrow Area DOZER 4 19.14 $26,454.00 <br />024 Regrade Hubbard Creek Vent Shaft Pad DOZER 4 1.89 -$2,608.00 <br />025 Regrade Upper Parking Lot Expansion Area EXCAVATE 1 3.65 $990.00 <br />026 Haul Mat'l from Bowie No. 1 Stkpl to Hubbard Crk <br />Vent Shaft <br />TRUCK1 1 26.68 -$23,794.00 <br />027 Haul Rock to Vent Shafts for Disposal TRUCK1 1 10.50 $3,903.00