Laserfiche WebLink
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,July 09,2016 <br /> anchor trench was constructed in accordance with the design drawings and project technical <br /> specifications. <br /> 2.4 Geomembrane Acceptance <br /> No panels were accepted for Drain Cover Fill placement. The attached Figure 3 shows the <br /> previous acceptance areas. <br /> 3.0 STORM WATER MANAGEMENT <br /> Best Management Practices continued to be performed. <br /> 4.0 NEWFIELDS LABORATORY ACTIVITIES <br /> NewFields personnel performed sieve analysis, atterberg limits, compaction and permeability <br /> testing. The following samples were collected for laboratory testing: <br /> Soil Liner Fill: NFSLF-34-C (Dump 1 Processing Plant) <br /> Soil Liner Fill: NFSLF-35-R (Phase 1 VLF) <br /> Drain Cover Fill: NFDCF-7-R (Phase 1 VLF) <br /> 5.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the Weekly Contractor Planning Meeting (July 6, 2016), Ames <br /> daily safety meetings, and NewFields daily safety meetings. <br /> 6.0 MISCELLANEOUS, ISSUES AND CONCERNS <br /> The 793 haul truck berm along the VLF2 Haul Road was placed on approved DCF from <br /> approximately Station 50+00 to Station 62+00 of the Haul Road. <br /> Page 4 <br />