My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-25_HYDROLOGY - M1980244 (4)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1980244
>
2016-07-25_HYDROLOGY - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 4:28:28 PM
Creation date
7/26/2016 8:02:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Hydrology
Doc Date
7/25/2016
Doc Name
Weekly Construction Quality Assurance
From
Newmont
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation s <br /> Cripple Creek&Victor Gold Mine ■ <br /> Squaw Gulch VLF CQA <br /> NewFields Job No.475.0106.006 <br /> Week Ending Saturday,July 16,2016 <br /> were performed using the extrusion welding method for all marked defects. Vacuum testing <br /> was performed for all extrusion welded seams and repairs. <br /> 2.3 Anchor Trench <br /> Approximately 345 feet of interim anchor trench was excavated along the Phase 1 9,850-foot <br /> bench and 585 feet of permanent anchor trench was excavated along the Phase 1 perimeter <br /> between the 9,850-foot and 9,950-foot bench in accordance with design drawings and project <br /> technical specifications. <br /> Anchor trench backfill was performed using an skid steer, a vibratory plate compactor and <br /> laborers. A NewFields representative monitored the backfill procedures to ensure that the <br /> anchor trench was constructed in accordance with the design drawings and project technical <br /> specifications. <br /> 2.4 Geomembrane Acceptance <br /> Panels P-1896 through P-2007 were accepted for Drain Cover Fill placement. The attached <br /> Figure 3 shows the acceptance areas. <br /> 3.0 STORM WATER MANAGEMENT <br /> Best Management Practices continued to be performed. <br /> 4.0 NEWFIELDS LABORATORY ACTIVITIES <br /> NewFields personnel performed sieve analysis, atterberg limits, compaction and permeability <br /> testing. The following samples were collected for laboratory testing: <br /> Soil Liner Fill: NFSLF-36-C and NFSLF-38-C (Dump 1 Processing Plant) <br /> Soil Liner Fill: NFSLF-37-R (Phase 1 VLF) <br /> Drain Cover Fill: NFDCF-B-R (Phase 1 VLF) <br /> 5.0 MEETINGS AND COMMUNICATIONS <br /> NewFields personnel attended the Weekly Contractor Planning Meeting (July 12, 2016), Ames <br /> daily safety meetings, and NewFields daily safety meetings. <br /> 6.0 MISCELLANEOUS, ISSUES AND CONCERNS <br /> The 793 haul truck berm along the VLF2 Haul Road was placed on approved DCF from <br /> approximately Station 62+00 to Station 64+00 of the Haul Road. <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.