Laserfiche WebLink
Trapper Mine; TR115 <br />Page 5 <br /> <br />Trapper’s Response: Trapper provided an estimate to revegetate the 154 acre area discussed <br />in the item above. They provided a new table A-11.1 in the cover letter but they did not <br />include a new copy for Appendix A. <br /> <br />DRMS Response: I have conducted an estimate for the additional KLM stripping area, <br />specifically for revegetation. See the attached CIRCES cost sheets for details. <br /> <br />6.1. Please submit a revised table A-11.1 for Appendix A. <br /> <br /> <br />New Building <br /> <br />7. Please provide details about the concrete perimeter foundation for the new building. Please <br />provide the dimensions of this foundation. <br /> <br />Adequately provided <br /> <br />8. Please update Table A-12.1, in Appendix A to include the new proposed building. <br /> <br />Trapper’s Response: Trapper provided a plan figure for the building and foundation. They <br />also provided an estimate for demolishing this structure. Table A-12.1 was not updated. <br /> <br />DRMS Response: Using the provided material, I have estimated the cost to demolish this <br />structure. See the attached CIRCES Sheets for details. <br /> <br />8.1. Please submit a revised table A-12.1 for Appendix A. <br /> <br /> <br />Sealing of Three Monitoring Wells <br /> <br />9. The direct cost to seal the proposed wells was estimated to be $3,510.00. See the attached CIRCES <br />cost sheet. <br />Trapper’s Response: Trapper accepts this estimate on the abandonment of the monitoring wells <br /> <br />Reclamation Cost Estimate <br /> <br />10. The current required surety for the Trapper Mine is set at $23,016,528.92. Enclosed is the <br />CIRCES cost estimate for TR115. Based on this estimate the liability will need to increase <br />by $586,438.57 for a total liability of $23,602,967.49. The current bond held for the site is <br />$23,400,000.00. Trapper will need to increase their financial warranty by $202,967.49. <br />