Laserfiche WebLink
Colowyo Coal Company L.P. <br />III. Summary of Reclamation and Management <br />A. General Description <br />As shown on Map 1, each area requested for bond release is comprised of smaller units, which <br />correspond to the specific year that backfilling, grading and reseeding were performed. The <br />work completed includes regrading to the approved post -mining topography, topsoil <br />replacement, and seeding with the approved seed mix. Grading and topsoil replacement was <br />generally performed in the summer and fall months and seeding occurred in the fall. The <br />following table presents when each reclamation parcel was regraded, topsoiled, and seeded. <br />Area <br />Total Acres <br />Regraded <br />(Year) <br />Topsoiled <br />(Year) <br />Seeded 1 <br />(Year) <br />EP036 <br />67.8 <br />2000 <br />2000 <br />2000 <br />EP037 <br />21.68 <br />2002 <br />2002 <br />2002 <br />EP038 <br />4.08 <br />2001 <br />2001 <br />2001 <br />EP039 <br />4.10 <br />2003 <br />2003 <br />2003 <br />EP040 <br />10.30 <br />2003 <br />2003 <br />2003 <br />EP041 <br />23.25 <br />2003 <br />2003 <br />2003 <br />EP042 <br />20.5 <br />2002 <br />2002 <br />2002 <br />EP043 <br />13.7 <br />2002 <br />2002 <br />2002 <br />EP044 <br />24.64 <br />2003 <br />2003 <br />2003 <br />WP008 <br />10.1 <br />2000 <br />2000 <br />2000 <br />WP009 <br />0.50 <br />2001 <br />2001 <br />2001 <br />WP011 i <br />1.70 <br />2001 <br />2001 <br />2001 <br />As noted in the above table, each of these reclamation parcels have met the minimum ten year <br />liability period in accordance with Rule 3.02.3(2)(b). <br />In accordance with the criteria set forth in the "Guideline Regarding Selected Coal Mine Bond <br />Release Issues", issued April 18, 1995, no rill and gully repair has occurred on any of the areas <br />applied for under this application in the last five years. This has been demonstrated through <br />Colowyo's annual rill and gully reports which are on file with Division. <br />No sediment control structures associated with these reclamation parcels are being requested to <br />be released under this application. <br />Phase I and II bond release has also been achieved on all parcels being applied for under this <br />application. The below table provides a bond release history for each reclamation parcel <br />included in this application. <br />SL -10 Phase III Bond Release Application Page 4 <br />