My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-21_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2016-07-21_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:25:02 PM
Creation date
7/25/2016 7:18:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
7/21/2016
Doc Name
Adequacy Review #2
From
Trapper Mining Inc
To
DRMS
Type & Sequence
TR115
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TR -115 Response 2 Cont. <br />Page 5 of 6 <br />6. It appears the KLM pit disturbed area is increasing in size as a result of TRI 15. The <br />reclamation cost estimate Table A-11.1 in Appendix A, shows a cost for reclaiming 490.3 <br />acres for the KLM pit. Please update this table to account for the increase in acreage of <br />the KLM pit. <br />Trapper's Response: Trapper provided an estimate to revegetate the 154 acre area <br />discussed in the item above. They provided a new table A-11.1 in the cover letter but they <br />did not include a new copy.forAppendix A. <br />DRMS Response: I have conducted an estimate for the additional KLM stripping area, <br />specifically for revegetation. See the attached CIRCES cost sheets for details. <br />6.1. Please submit a revised table A-11.1 for Appendix A. <br />Trapper Rc.sponse: Please see prior comment, table .4-11.1 has been updated for the <br />revised hoed section. <br />New Building <br />7. Please provide details about the concrete perimeter foundation for the new building. <br />Please provide the dimensions of this foundation. <br />DRMS Response: Adequately provided <br />Please update Table A-12.1, in Appendix A to include the new proposed building. <br />Trapper's Response: Trapper provided a plan figure for the building and,foundation. <br />Thev also provided an estimate for demolishing this structure. Table A-12.1 was not <br />updated. <br />DRMS Response: Using the provided material, I have estimated the cost to demolish this <br />structure. See the attached CIRCES Sheets for details. <br />8.1. Please submit a revised table A-12.1 for Appendix A. <br />Trapper Response: Please see prior comment, table .1-12.1 has been updated fi)r the <br />re4sed bond section. <br />Sealing of Three Monitoring Wells <br />The direct cost to seal the proposed wells was estimated to be $3,510.00. See the attached <br />CIRCES cost sheet. <br />Trapper's Response: Trapper accepts this estimate on the abandonment of the <br />monitoring wells <br />
The URL can be used to link to this page
Your browser does not support the video tag.