Laserfiche WebLink
Colorado Division of Reclamation, Mining and Safety <br />July 15, 2016 <br />Page 4 <br />the supply line at approximately 50'-60' intervals. Please clarify that the distance <br />between the supply line risers of 120' is appropriate for this application. <br />Response: The text on page 2 of Appendix 2.05.4(2)(e)-1 has been revised to state that <br />4" risers will be spaced at 50'-60' intervals for the side roll irrigation supply line. <br />Also included with this adequacy response package is a change of index sheet to ease <br />incorporation into the permit document and materials revised in response to your adequacy <br />comments. If you have any questions regarding the enclosed adequacy review responses, please <br />contact Tony Tennyson at (970) 824-1232 or ttennvson a]tristate�!t.org. <br />Sincerely, <br />Daniel J. Casiraro <br />Senior Manager <br />Environmental Services <br />DJC:JS:dbr <br />Enclosures <br />cc: Frank Ferris (via email) <br />Chris Gilbreath (via email) <br />Jason Storey (via email) <br />Tony Tennyson (via email) <br />File: G474 -11.3(21)c-3 <br />AN EQUAL OPPORTUNITY /AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy'Cooperative <br />