My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-21_REVISION - M1980244 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2016-07-21_REVISION - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2020 3:35:57 PM
Creation date
7/22/2016 8:02:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
7/21/2016
Doc Name
Technical Review
From
Newmont
To
DRMS
Type & Sequence
TR79
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Memorandum <br /> Cripple Creek&Victor Gold Mine ■ <br /> Stability Evaluation for Arequa Gulch VLF—Mill Solution Injection Program <br /> NewFields Job No.475.0106.008 <br /> July 12,2016 <br /> According to CC&V, the solution will contain some fine solids from the milling process that have <br /> the potential to precipitate out following exposure to the atmosphere. Over time these have <br /> the potential to accumulate in the wells, and if needed, clearing of the wells would be <br /> completed using the existing Hydro-Jex"' injection program/methodology already in use at the <br /> site. As shown by AMEC (2009), temporary pressurized injection of solution into the wells will <br /> not influence the stability. Flows should be monitored to ensure overfilling of the wells does <br /> not occur that can result in local erosion and instability. <br /> If you have any questions or require additional information, please contact the undersigned. <br /> Sincerely, <br /> NewFields Mining Design &Technical Services Reviewed by: <br /> Nicholas T. Rocco, P.E. Jay Janney-Moore, P.E. <br /> Senior Geotechnical Engineer Project Manager <br /> NTR/JJM/ntr <br /> T <br /> Attachment <br /> Q 75A <br /> Addressee: (via e-mail) .,2-IGR, <br /> P:\Pro1ects\0106.008AGVLP Injection Wells\J-REPORTS\TM AGVLF_InjectionWells.docxS''" <br /> AL <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.