My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-07-14_PERMIT FILE - M2016010 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2016010
>
2016-07-14_PERMIT FILE - M2016010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 10:56:21 AM
Creation date
7/20/2016 12:14:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016010
IBM Index Class Name
Permit File
Doc Date
7/14/2016
Doc Name
Adequacy Review Response
From
Transit-Mix Concrete Co.
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transit Mix Concrete Co. <br /> 11. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015,please commit to submitting a plan to divert surface water runoff <br /> around the pit walls. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 12. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015,please commit to submitting a plan to install instrumented <br /> groundwater monitoring wells behind the highwalls where natural topography continues <br /> above the pit crest. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 13. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment - Rev. <br /> B, dated January 26, 2015,please commit to additional geotechnical investigations to <br /> determine if adversely dipping low angle faults are present. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 14. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015,please commit to routine monthly bench face mapping by <br /> qualified personnel to assess the rock mass quality and structural geology against design <br /> assumptions throughout quarry development. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 15. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015,please commit to routine visual inspection of the pit slopes by <br /> qualified personnel to identify blast damage and modify blasting techniques as required. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 16. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015, please commit to routine pit slope movement monitoring with <br /> EDM/Prism surveying, laser scanning, and/or extensometers. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 17. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015, please commit to routine daily visual inspections by qualified <br /> personnel to assess pit slope stability, catchment benches, berms, clean-up efforts, restricted <br /> access points and monitoring systems. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> Hitch Rack Ranch Quarry(M-2016-010) <br /> Response to Comments—July 14, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.