Laserfiche WebLink
Transit Mix Concrete Co. <br /> 11. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015,please commit to submitting a plan to divert surface water runoff <br /> around the pit walls. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 12. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015,please commit to submitting a plan to install instrumented <br /> groundwater monitoring wells behind the highwalls where natural topography continues <br /> above the pit crest. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 13. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment - Rev. <br /> B, dated January 26, 2015,please commit to additional geotechnical investigations to <br /> determine if adversely dipping low angle faults are present. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 14. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015,please commit to routine monthly bench face mapping by <br /> qualified personnel to assess the rock mass quality and structural geology against design <br /> assumptions throughout quarry development. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 15. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015,please commit to routine visual inspection of the pit slopes by <br /> qualified personnel to identify blast damage and modify blasting techniques as required. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 16. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015, please commit to routine pit slope movement monitoring with <br /> EDM/Prism surveying, laser scanning, and/or extensometers. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> 17. Comment: As recommended in Section 6.3 of the Norwest Geotechnical Assessment- Rev. <br /> B, dated January 26, 2015, please commit to routine daily visual inspections by qualified <br /> personnel to assess pit slope stability, catchment benches, berms, clean-up efforts, restricted <br /> access points and monitoring systems. <br /> Response: See Transit Mix memorandum included in Exhibit 6.5. <br /> Hitch Rack Ranch Quarry(M-2016-010) <br /> Response to Comments—July 14, 2016 <br />